Hoisting construction method for square butt joint and inserting connection between bridge steel box girder sections

A construction method and technology of steel box girders, which are applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as heavy welding and repair work, hidden quality problems, and damage to steel box girder diaphragms, and reduce welding costs. The effect of reducing workload, avoiding quality risks, and shortening the construction period

Active Publication Date: 2017-05-24
SHANGHAI BAOYE GRP CORP
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Routinely, it is necessary to hoist the top and bottom cutting gaps of the diaphragm of the post-installed bridge section, which will cause irreversible damage to the diaphragm of the steel box girder, and there are quality risks, and the later welding and repair work will be heavy

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] A construction method for flat butt plug connection and hoisting between segments of a bridge steel box girder, the construction method comprising:

[0014] Step 1, the box chamber bridge section with webs on both sides of the bridge steel box girder is first hoisted to the tire frame adjustment section, and accurately positioned;

[0015] Step 2: Expand and hoist the rear-mounted bridge section of the box room with only one side of the web to both sides, set a shackle between the two outer hoisting wire ropes and the lifting lug, and set two tandem unloading buttons for each of the two inner hoisting wire ropes. Buckle, the outside hoisting wire rope is supplemented by a chain hoist to tighten it to adjust the inclination angle of the bridge section;

[0016] Step 3: The hook is translated in translation. When the diaphragm of the rear-mounted bridge section is in contact with the top plate of the first-mounted bridge section, it is pulled and tightened by the horizont...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to bridge construction and provides a hoisting construction method for square butt joint and inserting connection between bridge steel box girder sections. The method comprises the following steps that the box bridge sections with webs on the two sides of the mid-span of a bridge steel box girder are hoisted to an adjusting section of a jig frame firstly; a shackle is arranged between two strands of hoisting steel wire ropes and lifting lugs outside the after-installed bridge section of the box with the weds only on one side correspondingly, two strands of hoisting steel wire ropes inside the after-installed bridge section of the box with the weds only on one side are each provided with two serial shackles, and chain blocks are arranged on the steel wire ropes outside the after-installed bridge section of the box with the weds only on one side in an auxiliary mode for tightening; lifting hook is subjected to translation, when diaphragm plates of the after-installed bridge section make contact with top plates of the firstly-installed bridge section, tightening is conducted through traction of horizontal chain falls, and loosening and hook dropping are conducted through cooperation of hoisting chain falls; the diaphragm plates of the after-installed bridge section are completely stuffed in place, and then the lifting hooks completely continue to be subjected to hook dropping till complete loosening is achieved; the after-installed bridge section is measured, the scale height is adjusted by means of the method that base plates are assembled or disassembled at the tops of small vertical pillars of the adjusting section till design requirements are met; and the horizontal chain falls are loosened, the hoisting shackles are disassembled, and thus the after-installed bridge section is completed. According to the hoisting construction method for square butt joint and inserting connection between the bridge steel box girder sections, damage cannot be caused to the diaphragm plates.

Description

technical field [0001] The invention relates to bridge construction, in particular to a construction method for bridge steel box girder segments. Background technique [0002] Considering the transportation problem, the bridge steel box girder is generally divided into longitudinal sections of the box room, and there are two subsections: lap joint and flat butt joint (or plug joint). The lap joint construction is routinely used between the steel box girder bridge sections, which is easy to hoist, but the elevation weld of the full length of the site web and the roof is added. The roof is conventionally provided with U-shaped ribs. There are many unfavorable factors in bearing dynamic loads, so the horizontal butt connection between bridge sections in the span direction has become the mainstream method. [0003] When the steel box girder bridge section is flat butt (plugged) hoisting, the diaphragm of the rear-mounted bridge section is plugged between the top plate and the b...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00E01D2/04
CPCE01D2/04E01D21/00
Inventor 陈辉遇瑞黄强包先云
Owner SHANGHAI BAOYE GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products