A technology for combined application and tunnel excavation, applied in tunnels, earth-moving drilling, mining equipment, etc., can solve the problems of prolonging the construction period, increasing the construction cost, and the blasting impact force is large, and achieves a simple construction process and saves construction costs. , the effect of improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Such as figure 1 As shown, a construction method for excavating tunnels with the combined application of high-pressure water splitting and drilling and blasting is carried out in accordance with the following steps:
[0027] (1) Determine the excavation tunnel boundary 3 according to the design requirements;
[0028] (2) Boundary holes 1 are drilled at a certain distance along the tunnel design boundary 3. Boundary holes 1 are uniformly arranged along the tunnel boundary 3. The hole depth of boundary holes 1 is 2m, and the distance between boundary holes 1 is 1.0m. 1 has a diameter of 8cm;
[0029] (3) Inject high-pressure water into the boundary hole 1, the water pressure of which is 30MPa, use high-pressure water to cause cracks in the surrounding rock formations of the boundary hole 1, and form surrounding connecting cracks along the tunnel boundary 3;
[0030] (4) In the face of the tunnel, drill and blast method is used to excavate the rock mass inside the design...
Embodiment 2
[0034] Such as figure 1 As shown, a construction method for excavating tunnels with the combined application of high-pressure water splitting and drilling and blasting is carried out in accordance with the following steps:
[0035] (1) Determine the excavation tunnel boundary 3 according to the design requirements;
[0036] (2) Boundary holes 1 are drilled at a certain distance along the tunnel design boundary 3. Boundary holes 1 are evenly arranged along the tunnel boundary 3. The hole depth of boundary holes 1 is 3.5m, and the hole spacing between boundary holes 1 is 0.6m. The diameter of hole 1 is 10cm;
[0037] (3) Inject high-pressure water into the boundary hole 1. The water pressure of the high-pressure water is 200MPa. The high-pressure water is used to crack the rock formation around the boundary hole 1, and form surrounding connecting cracks along the tunnel boundary 3;
[0038] (4) In the face of the tunnel, drill and blast method is used to excavate the rock mass...
Embodiment 3
[0042] Such as figure 1 As shown, a construction method for excavating tunnels with the combined application of high-pressure water splitting and drilling and blasting is carried out in accordance with the following steps:
[0043] (1) Determine the excavation tunnel boundary 3 according to the design requirements;
[0044] (2) Boundary holes 1 are drilled at a certain distance along the tunnel design boundary 3. Boundary holes 1 are evenly arranged along the tunnel boundary 3. The hole depth of boundary holes 1 is 3m. 1 has a diameter of 5cm;
[0045] (3) Inject high-pressure water into the boundary hole 1, the water pressure of which is 100MPa, use high-pressure water to crack the rock formation around the boundary hole 1, and form surrounding connecting cracks along the tunnel boundary 3;
[0046] (4) In the face of the tunnel, drill and blast method is used to excavate the rock mass inside the design boundary, and the detonation hole 2 is drilled inside the excavation tu...