Preparation method of OGFC (Open Graded Friction Course)-13 asphalt mixture doped with short-cut basalt fiber
An OGFC-13, basalt fiber technology, applied in ceramic products, applications, household appliances, etc., can solve the problems of high raw material cost, aging of asphalt membrane, easy to produce rutting, etc., to improve high temperature resistance stability, good road surface smoothness , the effect of prolonging the service life
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] First, heat the finished SBS modified asphalt to a molten state in an oven at 165°C, and then preheat 11,760g of coarse and fine aggregates and 240g of mineral powder (limestone with a particle size below 0.075mm) in an oven at 195°C for more than 6 hours for heat preservation. Heat to the mixing temperature of 170°C, then add 11760g of preheated coarse and fine aggregates (the mass of 1# material, 2# material, 3# material and 4# material are 3960g, 5640g, 660g, 1500g respectively) and mix Mix in the pot for 15 seconds, add 36g of chopped basalt fiber and 50.1g of HVA high-viscosity agent and mix for 90 seconds, add 552g of the above-mentioned SBS modified asphalt for heat preservation and mix for 90 seconds, mix in 240g of preheated mineral powder and mix In 90s, the rutting slab test piece was formed by rolling and forming with a wheel roller forming machine to prepare the rutting slab mixed with chopped basalt fiber OGFC-13 asphalt mixture; the asphalt-asphalt ratio w...
Embodiment 2
[0027] First, heat the finished SBS modified asphalt to a molten state in an oven at 165°C, and preheat 3920g of coarse and fine aggregates and 80g of mineral powder (limestone with a particle size of 0.075mm or less) in an oven at 195°C for more than 6 hours for heat preservation. Heat to the mixing temperature of 170°C, then add 3920g of preheated coarse and fine aggregates (the mass of 1# material, 2# material, 3# material and 4# material are 1320g, 1880g, 220g, 500g respectively) and mix Mix in the pot for 15 seconds, add 12g of chopped basalt fiber and 16.7g of HVA high-viscosity agent and mix for 90 seconds, add 192g of the above-mentioned SBS modified asphalt for heat preservation and mix for 90 seconds, mix in 80g of preheated mineral powder and mix In 90s, the Marshall test piece was prepared by the compaction method, and the Marshall test piece was formed by the asphalt mixture mixed with chopped basalt fiber OGFC-13; the asphalt-asphalt ratio was 4.8%.
PUM
Property | Measurement | Unit |
---|---|---|
particle size | aaaaa | aaaaa |
voidage | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com