A power distribution network planning method based on different investment subjects under deregulation of incremental power distribution service
A technology for distribution network planning and distribution network, applied in the direction of resources, data processing applications, forecasting, etc., can solve the problems of improper unit output, affecting the operation quality and safety of the power system, and no longer adapting to distribution network planning problems.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The technical solution of the invention will be described in detail below in conjunction with the accompanying drawings.
[0033] Such as figure 1 Shown is the flow chart of the distribution network planning method based on different distribution network investment entities under the liberalization of incremental power distribution business. The following will describe each step in detail.
[0034] Step 1: Distribution network optimization is performed separately for distribution network 1, distribution network 2 and distribution network 3, and the optimization goal is to meet the specified reliability requirements and minimize the planning cost under constraints.
[0035] by the grid company W 1 The objective function f of the power distribution network to be built 1 for:
[0036]
[0037] In formula (1), k 1 For the grid company W 1 The line capital recovery coefficient of the invested and built distribution network; v 1 For the grid company W 1 Proportion o...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


