A construction method and technology for rainwater inlets, applied in waterway systems, sewage removal, water supply devices, etc., can solve problems such as multi-integrity, and achieve the effects of improving construction efficiency, green environmental protection construction, good economic and social benefits

Inactive Publication Date: 2017-10-20
广州市第三市政工程有限公司
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the above-mentioned technical problems, the object of the present invention is to provide a construction method for a gully, which is not affected by the construction space and can control the quality of the entire gully; it is also effective for the existing prefabricated assembled rainwater There are many joints in the construction of the outlet and the defects of poor integrity, the number of joints and the splicing time of the well body of the rainwater well are reduced, and the integrity and construction efficiency of the well body of the rainwater well are improved.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of gutter inlet
  • Construction method of gutter inlet
  • Construction method of gutter inlet

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0038] A kind of construction method of gully in the preferred embodiment of the present invention, as Figures 1 to 5 As shown, it includes the following steps:

[0039] Prepare:

[0040] Step 1: Process several complete sets of base formwork 1 and well body formwork 2 respectively, and brush release agent on the base formwork 1 and the well body formwork 2;

[0041] Step 2: Process the base frame and the well body frame respectively according to the sizes of th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of water supply and drainage works, and mainly provides a construction method of a gutter inlet. Mainly by combining base skeletons and well body skeletons, which have been processed in a prefabricating yard, with multiple sets of base templates and well body templates, and then implementing concrete pouring, a purpose of prefabricating spliced gutter inlet bases and gutter inlet well bodies in batch can be achieved. With the application of the construction method of the gutter inlet provided by the invention, quality problems caused by an insufficient construction space can be effectively solved; moreover, working efficiency can be greatly improved, a construction period can be shortened and good social and economic benefits can be caused; meanwhile, the gutter inlet provided by the invention, which adopts a reinforced concrete structure, is high in compressive strength, so that the gutter inlet can adapt to demands of complex urban roads on gutter inlets; therefore, the construction method has a broad application space in construction of urban road gutter inlets and has a quite high promotional value.

Description

technical field [0001] The invention relates to the technical field of water supply and drainage engineering, in particular to a construction method for a gully. Background technique [0002] When the gully is constructed according to the traditional construction technology, there is a shortcoming that it is affected by the space, and the quality of the whole process is not easy to control; and the traditional gully cannot be prefabricated in advance, and it will also affect the construction period. At the same time, in the existing prefabricated gully construction technology, for example: the patent application publication number is CN 103088900A, the invention name is "prefabricated assembled gully and its construction method", the patent assembles the gully by many gully wall panels In this way, the prefabricated assembled gully has a poor integrity of the gully body, and the quality of the assembled interface is difficult to control, which may easily lead to leakage of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E03F1/00E03F5/04
CPCE03F1/00E03F5/0401
Inventor 何亮邱永钦陈建宁林涛颜苓余跃杨添
Owner 广州市第三市政工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products