Novel test method of control response time of motor of new energy automobile
A new energy vehicle, response time technology, applied in the direction of electrical testing/monitoring, program control, general control system, etc., can solve the problem that the response time of the motor controller cannot be measured conveniently, achieve novel design and overcome human factors Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0013] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
[0014] A novel new energy vehicle motor control response time test method, including a central processing unit, the central processing unit is provided with an operation control system, the method uses the operation control system to operate, and the operation process of the method is: the operation control system uses a man-machine The interactive way realizes the remote control and parameter setting of the equipment in the test system. The operation control system is equipped with a motor DC power tester and a motor DC load tester. The input terminals of the motor DC power tester include the DC power input terminal positive pole, The DC power input terminal negative pole, the output terminal of the motor DC power tester includes the positive pole...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com