Construction method of underground pipe gallery passing through underground concrete water pipe

A construction method and technology of underground pipe gallery, applied in water conservancy projects, artificial islands, underwater structures, etc., can solve problems such as high cost, inability to drain water, and inability to cut off concrete water pipes, and achieve low cost and small construction volume Effect

Active Publication Date: 2019-07-09
CHINA HUAYE GROUP +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because the underground pipe gallery is a linear project, if the route is changed, the concrete water pipe needs to detour for hundreds or even thousands of meters. Not only the amount of work is large, the cost is high, the construction period will also be affected, and the detour pipeline will also affect the smooth discharge of sewage
[0003] In addition, when the pre-laid underground pipe gallery crosses the underground concrete water pipe, the concrete water pipe cannot be cut off, otherwise it will not be able to drain water, and the pre-laid underground pipe gallery has no site diversion, so the laying of the underground pipe gallery cannot be realized

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of underground pipe gallery passing through underground concrete water pipe
  • Construction method of underground pipe gallery passing through underground concrete water pipe
  • Construction method of underground pipe gallery passing through underground concrete water pipe

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] In the following description, for purposes of explanation, numerous specific details are set forth in order to provide a thorough understanding of one or more embodiments. It may be evident, however, that these embodiments may be practiced without these specific details.

[0017] figure 1 It is a flow chart of the construction method of the underground pipe gallery passing through the underground concrete water pipe according to the present invention, Figure 2-5 It is a schematic diagram of the construction method of the underground pipe gallery passing through the underground concrete water pipeline according to the present invention, as Figure 1-5 As shown, the construction method of the underground pipe gallery passing through the underground concrete water pipeline includes:

[0018] In step S110, the foundation pit 1 is dug around the concrete water pipeline 100 by using the construction method of grading, preferably, as figure 2 As shown, before the grading ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method of an underground pipe gallery through an underground concrete water pipeline. The construction method comprises the following steps that a foundation pit is excavated around the concrete water pipeline by adopting a sloping construction method; the external two sides of a slope are each provided with a conversion pool, a steel pipe is arranged between the two conversion pools, and the two ends of the steel pipe extend into the two conversion pools correspondingly; the portions, in the two conversion pools, of the concrete water pipeline are provided with a water inlet and a water outlet correspondingly; the concrete water pipeline is cut off between the two conversion pools, and cut-off openings are blocked; pipe gallery construction is conducted; and after pipe gallery construction, backfilling is conducted to the position below the concrete water pipeline by a set distance, a concrete plate belt with the thickness being the preset distance is arranged between the two conversion pools, the concrete water pipeline is recovered, the first conversion pool and the second conversion pool are dismounted, backfilling is conducted to a roadbed, and the road surface is constructed. According to the construction method, the steel pipe is adopted, after excavation of the pipe gallery is completed, the concrete water pipeline is recovered, and it is ensured that corrosion prevention and sludge removing of the concrete water pipeline after construction do not need to make a detour.

Description

technical field [0001] The invention relates to the technical field of underground pipe gallery construction, and more specifically, relates to a construction method for an underground pipe gallery passing through underground concrete water pipes. Background technique [0002] The construction of underground comprehensive pipe gallery, especially in the old urban area, will inevitably encounter various obstacles. In particular, when the pre-laid underground pipe gallery encounters underground concrete water pipes, the traditional method is to reroute the concrete water pipes, that is, to arrange another one first. The concrete water pipes are tripped to avoid the excavation range of the underground pipe gallery, and the excavation is organized after another concrete water pipe is connected to the original underground concrete water pipe. Because the underground pipe gallery is a linear project, if the line is changed, the concrete water pipe needs to detour for hundreds or e...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/045
CPCE02D29/10
Inventor 谭福生郑宇乔风军
Owner CHINA HUAYE GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products