Prefabricated concrete pavement structure
A concrete pavement, prefabricated assembly technology, applied to pavement, roads, roads and other directions paved with prefabricated blocks, can solve the problems of long construction period, low production efficiency, long seasonal downtime, etc., and achieve rapid assembly paving, installation Fast speed, good shear stress effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] A preparation method of high-strength frost-resistant concrete is characterized in that the method comprises the following steps:
[0028] Add 300 parts of cement, 60 parts of quicklime, 600 parts of aggregate, 2.5 parts of activator and 5.8 parts of amphoteric dispersant into 300 parts of water, stir and mix evenly, control the dispersion degree of the slurry at 18cm, the temperature at 45°C, and the stirring speed 650r / min;
[0029] The material obtained in the above steps is poured, and after pouring, it is sent to a static chamber with a temperature of 50°C and a humidity of 60°C for thickening for 3 hours;
[0030] After thickening, the material is demolded and cut to obtain the green body of the required specification and size, and then the green body is
[0031] Send it to the autoclave for steam curing for 2 hours. After leaving the autoclave, it will be naturally cured for one week to obtain the final high-strength frost-resistant concrete.
[0032] Wherein t...
Embodiment 2
[0046] Add 300 parts of cement, 60 parts of quicklime, 600 parts of aggregate, 1 part of activator and 8 parts of amphoteric dispersant into 300 parts of water, stir and mix well, control the dispersion degree of the slurry at 18 cm, the temperature at 45 °C, and the stirring speed 650r / min;
[0047] The material obtained in the above steps is poured, and after pouring, it is sent to a static chamber with a temperature of 50°C and a humidity of 60°C for thickening for 3 hours;
[0048] After the thickening is completed, the material is demoulded and cut to obtain the green body of the required specification and size, and then the green body is sent to the autoclave for steam curing for 2 hours. After leaving the autoclave, it is naturally cured for a week to obtain the final high-strength antifreeze concrete;
[0049] All the other preparations are the same as in Example 1.
Embodiment 3
[0051] Add 400 parts of cement, 10 parts of quicklime, 500 parts of aggregate, 2.5 parts of activator and 5.8 parts of amphoteric dispersant into 300 parts of water, stir and mix evenly, control the dispersion degree of the slurry at 18cm, the temperature at 45°C, and the stirring speed 650r / min;
[0052] The material obtained in the above steps is poured, and after pouring, it is sent to a static chamber with a temperature of 50°C and a humidity of 60°C for thickening for 3 hours;
[0053] After the thickening is completed, the material is demoulded and cut to obtain the green body of the required specification and size, and then the green body is sent to the autoclave for steam curing for 2 hours. After leaving the autoclave, it is naturally cured for a week to obtain the final high-strength antifreeze concrete;
[0054] All the other preparations are the same as in Example 1.
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com