Pressure monitoring method for judging incoming water direction of horizontal well
A pressure monitoring and horizontal well technology, which is applied in the field of oil and gas production and horizontal well oil production in low-permeability oil reservoirs, can solve problems such as poor fitting effect, failure to provide judgment on the direction of incoming water, and failure to consider the interference effect of water injection wells. Improve production efficiency, easy to operate, and the effect of simple and easy-to-understand methods
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0083] Such as figure 1 As shown, in the injection-production well pattern of vertical well water injection and horizontal well oil production (such as five-point well pattern, seven-point well pattern), this embodiment takes the five-point well pattern as an example to implement a method for horizontal wells. The pressure monitoring method for judging the direction of incoming water includes the following steps:
[0084] ①Monitoring the bottom hole pressure change data of horizontal wells;
[0085] ②Considering the changes in the working system of surrounding water injection wells, design the interference test between water injection wells and horizontal wells;
[0086] ③Establish the bottom hole pressure analysis chart of horizontal well under the interference of water injection well;
[0087] ④Fit and analyze the measured bottomhole pressure data to obtain the reservoir parameters under different water injection wells with different water injection rates. By analyzing and...
Embodiment 2
[0140] In this embodiment, a horizontal well in a certain oil field is preferred, and the initial fluid production of this horizontal well is 15m 3 / d. There are 6 water injection wells around the horizontal well, respectively numbered water injection well 1, water injection well 2, water injection well 3, water injection well 4, water injection well 5, water injection well 6, and their water injection volumes are 15, 20, 25, 15, 20 、30m 3 / d, the distances from horizontal wells are 445, 460, 457, 468, 455, 450m respectively. The pressure monitoring method for judging the incoming water direction of the horizontal well in the present embodiment comprises the following steps:
[0141] ①Monitoring the bottom hole pressure change data of horizontal wells;
[0142] ②Considering the changes in the working system of surrounding water injection wells, design the interference test between water injection wells and horizontal wells;
[0143] ③Establish the bottom hole pressure anal...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com