BIM-cloud-platform-based application of mobile terminal in engineering quality checking
A mobile terminal and engineering quality technology, applied in the field of engineering construction management, can solve problems such as inability to integrate drawings, low efficiency, and long program management time, and achieve the effects of efficient management, improved construction efficiency, and reduced program management time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] Virtual environment roaming includes the following steps:
[0026] a1. Use BIM drawing software to establish an accurate 3D building model according to the construction drawings, and upload the model to the cloud server after completion;
[0027] a2. Before conducting physical quality inspection on the construction site, download the project BIM 3D model in the cloud server through the corresponding software on the handheld mobile terminal;
[0028] a3. Take the hand-held mobile terminal to the site where the on-site physical quality inspection is carried out, and use the touch or weight sensor to control and observe the panoramic direction in the mobile terminal, and roam in the virtual environment; through the three-dimensional visualization technology of the BIM model, the identification system is reasonable Analyze gender and spatial positioning to achieve the best visual effect;
[0029] a4. Position the BIM model with the on-site physical components or grids, ver...
Embodiment 2
[0031] Collision checking consists of the following steps:
[0032] B1. Through the BIM model in the handheld mobile terminal, roam in the virtual environment and compare it with the real environment of the construction site, conduct collision checks, and verify the actual measurement values;
[0033] b2. Record the inspection results at any time according to the inspection situation, mark and label the components directly, set descriptions, event types, inspection dates and priority levels of personnel in charge, etc., take on-site photos of parts with quality problems, and compare the site with the BIM model For comparison, send an email to the relevant person in charge;
[0034] b3. Upload the inspection results through the handheld mobile terminal, provide the inspection list to the people in each job position of the whole project, help them record and report their work, and control errors, omissions, and deficiencies in real time;
[0035] b4. After the quality problem i...
Embodiment 3
[0038] Reverse construction verification includes the following steps:
[0039] c1. Use 3D laser scanning technology to build a physical model of the site through phase point cloud;
[0040] c2. Then reversely compare and match with the BIM three-dimensional information model to check the quality of the completed construction, minimize rework and improve quality.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com