A double-twisting machine and frame technology, which is applied in the direction of textiles, papermaking, rope-making auxiliary devices, textile cables, etc., can solve the problems of large equipment vibration, uneven removal allowance, and low bearing life, so as to improve the frame High flatness and position accuracy, improved processing quality and service life, and improved production speed and quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Embodiment 1: A method for processing the above-mentioned large-scale double twisting machine frame, including the following steps:
[0042] 1) Divide the frame of the large double-twist machine into three parts: the first main shaft frame 1, the second main shaft frame 2, and the intermediate shaft 3 for processing, and process the corresponding plates according to the required plate size of each part. 1. The plates of each part of the second main shaft 2, the intermediate shaft 3 are made of CO 2 Shielded welding corresponds to welding, CO 2 The welding current of shielded welding is 250A, the welding voltage is 45V, and the shielding gas is CO 2 The flow rate is 35L / min, the welding speed is 80mm / min, and the weld height is 6mm. After the welding is completed, clean and polish the weld;
[0043] 2) Step 1) Welded first main frame 1, second main frame 2, and intermediate shaft 3 are kept for 3 hours at an annealing temperature of 500°C for stress relief annealing, and then ...
Embodiment 2
[0048] Embodiment 2: A method for processing the above-mentioned large-scale double twisting machine frame, including the following steps:
[0049] 1) Divide the frame of the large double-twist machine into three parts: the first main shaft frame 1, the second main shaft frame 2, and the intermediate shaft 3 for processing, and process the corresponding plates according to the required plate size of each part. 1. The plates of each part of the second main shaft 2, the intermediate shaft 3 are made of CO 2 Shielded welding corresponds to welding, CO 2 The welding current of shielded welding is 200A, the welding voltage is 40V, and the shielding gas is CO 2 The flow rate is 30L / min, the welding speed is 70mm / min, and the weld height is 4mm. Clean and polish the weld after welding;
[0050] 2) Step 1) Welded first main frame 1, second main frame 2, and intermediate shaft 3 are kept for 2 hours at an annealing temperature of 450°C for stress relief annealing, and then cooled to 300°C wi...
Embodiment 3
[0055] Embodiment 3: A processing method of the above-mentioned large double twisting machine frame, including the following steps:
[0056] 1) Divide the frame of the large double-twist machine into three parts: the first main shaft frame 1, the second main shaft frame 2, and the intermediate shaft 3 for processing, and process the corresponding plates according to the required plate size of each part. 1. The plates of each part of the second main shaft 2, the intermediate shaft 3 are made of CO 2 Shielded welding corresponds to welding, CO 2 The welding current of shielded welding is 220A, the welding voltage is 42V, and the shielding gas is CO 2 The flow rate is 32L / min, the welding speed is 75mm / min, and the weld height is 5mm. Clean and polish the weld after welding;
[0057] 2) Step 1) Welded first main shaft frame 1, second main shaft frame 2, and intermediate shaft 3 are kept at an annealing temperature of 480°C for 2 to 3 hours for stress relief annealing, and then cooled t...