Process for shafting and rudder system installation of multi-purpose ship
An installation process and multi-purpose technology, applied in the field of ships, can solve the problems of reduced utilization of longitudinal berths, adverse effects on shipbuilding unit production, and extended ship construction cycles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0027] A multi-purpose ship shaft and rudder system installation process is composed of the "double fixed and middle collection" launching process and the "underwater installation of the shaft and rudder system" process.
[0028] 1. The main contents of the "double fixed collection" launching process:
[0029] 1) Pre-stage technical preparation and equipment preparation to ensure that the stern tube and rudder sleeve arrive at the factory on schedule.
[0030] 2) Pre-drawing wires: Pre-drawing wires are used in the construction and closing of ship engine room and stern sections. During the closing process, the deformation caused by welding is continuously measured with the axis as the reference, and corrected in time, so as to minimize the deformation caused by welding. The resulting deformation is kept to a minimum to ensure the correct position of the shaft and rudder lines.
[0031] 3) Formal shafting and rudder line stays: After the hull has been penetrated and all major ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com