Embodiment 1
[0046] The structure of a road rainwater diversion treatment system in this embodiment is as follows: figure 1 As shown, the system includes a rainwater main pipe C and a sewage main pipe D on the municipal road R. The end of the rainwater main pipe C is a natural water body, and the end of the sewage main pipe D is a sewage treatment plant. The rainwater The main pipe C is segmented according to the length of 500-800m, and a diversion well 1 is set on each section of the rainwater main pipe C. The diversion well 1 has two water outlets, the first outlet is connected to the rainwater main pipe C, the second outlet is connected to the sewage main pipe D through the interceptor 2, and a lower opening weir gate is set in front of the first water outlet in the diversion well 1-1, an upward-opening gate 1-2 is set before the second water outlet in the diversion well.
[0047] The method for the system to treat rainwater is:
[0048] Set the predetermined flow rate of the second w...
Embodiment 2
[0053] The structure of a road rainwater diversion treatment system in this embodiment is as follows: figure 2 As shown, the system includes a rainwater main pipe C and a sewage main pipe D on the municipal road R. The end of the rainwater main pipe C is a natural water body, and the end of the sewage main pipe D is a sewage treatment plant. The rainwater The main pipe C is segmented according to the length of 500-800m, and a diversion well 1 is set on each section of the rainwater main pipe C. The diversion well 1 has two water outlets, the first outlet is connected to the rainwater main pipe C, the second outlet is connected to the sewage main pipe D through the interceptor 2, and a lower opening weir gate is set in front of the first water outlet in the diversion well 1-1; an upward-opening gate 1-2 is set in front of the second water outlet in the diversion well. An initial rain storage tank 3 is arranged on the intercepting pipe 2 .
[0054] The method for the system t...
Embodiment 3
[0061] The structure of a road rainwater diversion treatment system in this embodiment is as follows: image 3 As shown, the system includes a rainwater main pipe C and a sewage main pipe D on the municipal road R. The end of the rainwater main pipe C is a natural water body, and the end of the sewage main pipe D is a sewage treatment plant. The rainwater The main pipe C is segmented according to the length of 500-800m, and a diversion well 1 is set on each section of the rainwater main pipe C. The diversion well 1 has two water outlets, the first outlet is connected to the rainwater main pipe C, the second outlet is connected to the sewage main pipe D through the interceptor 2, and a lower opening weir gate is set in front of the first water outlet in the diversion well 1-1; an upward-opening gate 1-2 is set in front of the second water outlet in the diversion well. An initial rain storage tank 3 and an online processing tank 4 are arranged on the intercepting pipe 2 , and t...