A technology of high-rise buildings and construction methods, which is applied in the fields of construction, building structure, and building materials, and can solve problems such as potential safety hazards, poor stress, and difficulty in maintaining stability, so as to ensure quality, construction safety, and platform stability Reliable, load-bearing shape ideal effect

Active Publication Date: 2018-05-11
JIANGSU HUAJIAN CONSTR
View PDF9 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in fact, because the transfer floor is full of scaffolding and the supporting formwork is made of wooden keels, it not only requires a lot of labor and materials, but also has the following problems: 1) It needs to be installed on the ground floor and the first floor (-2, -1, 1) It is difficult to ensure that the vertical poles of the support system on each floor are in the same position when erecting a three-story full hall support frame, and the force is not good; 2) The full hall support frame on the basement floor must be removed when the beam-slab concrete on the first floor reaches the design strength, thus affecting the conversion The construction period of the first floor; 3) It is only applicable to the conversion floor in the lower floor (such as the second floor)
Practice has shown that the above-mentioned prior art has the following dis

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of transfer layer bailey frame platform of high-rise building
  • Construction method of transfer layer bailey frame platform of high-rise building
  • Construction method of transfer layer bailey frame platform of high-rise building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] The transfer floor of the high-rise building of this embodiment is located above the ninth floor, with a mezzanine on one side and no mezzanine on the other side. The construction method of the Bailey platform platform is as shown in the figure, and it is constructed according to the following steps:

[0029] The first step, install the lattice column - such as figure 1 As shown, the lattice columns 1 distributed at intervals are respectively installed by pre-embedded anchor bolts 1-3 on both sides of the lattice column foundation 1-2 that is integrated with the building foundation 1-1 at the position below the girder of the transfer floor, The lattice column 1 of this embodiment adopts the standard tower sections 1-4 of the tower crane to be spliced ​​section by section from bottom to top;

[0030] When splicing installation, use Figure 2.1 , Figure 2.2 , Figure 2.3 The tool-type operating platform 2 shown has a "concave"-shaped table top frame 2-1 welded by chan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of a transfer layer bailey frame platform of a high-rise building and belongs to the technical field of building construction. The construction method mainly comprises the steps that lattice columns are mounted; bailey frames are erected; I-shaped beams are hoisted; crossbeam formwork bottoms are built; sandwich plates are built; and transfer layers are constructed. Compared with the prior art, under the premise that the quality can be guaranteed, the construction method has the multiple remarkable advantages of convenient implementation, safety and reliability.

Description

technical field [0001] The invention relates to a building transfer floor belay frame platform, in particular to a high-rise building transfer floor bere frame platform, and also relates to a construction method, which belongs to the technical field of building construction. Background technique [0002] High-rise buildings often need to build transfer floor beret platforms due to structural changes between floors. [0003] According to the search, the Chinese invention patent with the application number of 201010135856.1 discloses a construction method for the transfer floor of a high-rise building beam structure. , easy quality control, low cost, and convenient construction. However, in fact, because the transfer floor is full of scaffolding and the supporting formwork is made of wooden keels, it not only requires a lot of labor and materials, but also has the following problems: 1) It needs to be installed on the ground floor and the first floor (-2, -1, 1) It is diffic...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04G21/00
CPCE04G21/00
Inventor 邓凯姜方敏吴刚刘成吴碧桥
Owner JIANGSU HUAJIAN CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products