Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Temporary road arrangement method for mountainous buildings based on BIM

A technology of temporary roads and layout methods, which is applied in the direction of instruments, electrical digital data processing, data processing applications, etc., and can solve problems such as inability to plan temporary roads

Inactive Publication Date: 2018-05-15
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF5 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because mountain buildings are different from plane buildings, when considering the design of temporary roads, not only the rationality of plane planning, but also the vertical space parameters such as climbing and turning radius of vehicles with heavy loads should be considered, so that vehicles can reach different mountains as much as possible. It is within the coverage of the tower crane of a single building on the slope; in addition, the installation of tower cranes, earthwork excavation, and construction sequence of mountain buildings are more restricted than the layout of plane buildings, so mountain buildings cannot be carried out as freely as plane buildings. Temporary Road Planning

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Temporary road arrangement method for mountainous buildings based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0030] Such as figure 1 As shown, the process of the present invention is as follows:

[0031] A BIM-based temporary road layout method for mountain building group construction includes:

[0032] Step 1. According to the mountain terrain GIS information data and the project geological survey report, establish a three-dimensional BIM model of the mountain building complex site;

[0033] Step 2. Establish three-dimensional BIM models of individual mountain buildings according to the architectural drawings;

[0034] Step 3. Integrate the site model with the single three-dimensional BIM model of the mountain building to obtain the overall BIM model of the mountain building group;

[0035] Step 4. Determine the starting point and end point of the main road in the temporary road construction of the mountain building group according to the area on the four sides of the outer wall of the mountain building group, such as the top east side and the bottom west side of the mountain building group ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a temporary road arrangement method for mountainous buildings based on the BIM. The method includes the following steps that a three-dimensional integral BIM model of the mountain buildings is built; a starting point, an end point and a boundary condition of a main road in temporary roads constructed for the mountain buildings are determined; a space planning set of the main road in the temporary roads constructed for the mountain buildings is determined, and an optimally planned arterial road is obtained through analysis; according to non-covered temporary-road regionof a tower crane of each individual building, a first-level branch road is built on the base of planning of the temporary roads constructed for the mountain buildings; according to the non-covered temporary-road region of the tower crane of each individual building, and secondary branch roads of the temporary roads constructed for the mountain buildings are sequentially built until each temporaryroad reaches the covered region of the tower crane of each individual building; construction and maintenance of specific trunk-line temporary roads and the construction base layer and surface layer of each level of branch temporary road are completed. Compared with the prior art, the method has the advantages of being reasonable, accurate, efficient, applicable, economical and the like.

Description

Technical field [0001] The invention relates to the field of mountain building construction, in particular to a BIM-based temporary road arrangement method for mountain building group construction. Background technique [0002] In order to greatly reduce mountain excavation, save resources, and protect the environment, mountain buildings are generally built according to mountain trends and mountains. During the construction of mountainous buildings, temporary roads need to be set up for material transportation and supply. Because the mountain building group is different from the plane building group, when considering the design of the temporary road, not only the rationality of the plan, but also the vertical space parameters such as the climbing and turning radius of the heavy load of the vehicle should be considered, so that the vehicle can reach the mountain as much as possible. In addition, the tower crane installation, earthwork excavation, and construction sequence of moun...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06Q50/08
CPCG06F30/13G06F30/20G06Q50/08
Inventor 徐宁
Owner SHANGHAI ERSHIYE CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products