Split bolt assembly and application thereof in water conservancy pouring formwork system
A technology of pulling bolts and components, which is applied to the preparation of building components on site, the connectors of formwork/formwork/work frame, construction, etc., which can solve the failure of secondary grouting, technical difficulties, and the inability to fully realize the closure of microscopic channels and other problems to achieve the effect of solving the plug hole plugging leakage, eliminating the need for treatment process, and avoiding the effect of water seepage in the bolt hole
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] refer to Figure 1 to Figure 3 , The structure of the pull bolt assembly, including the fastener 10, the pull rod 20, the connecting rod 30 and the lead screw 40, will be described in detail below.
[0034] Fastener 10, using existing M18 steel bolts, can be disassembled and reused.
[0035] The tie rod 20 is made of injection-molded engineering plastics, the diameter is about 25 mm, and one end of the tie rod is provided with a thread 21, and the thread is used to fix the fastener. The threaded end is provided with an enlarged shape, which is convenient to provide space for the thread. The other end of the pull rod is the hinge end 22, which is provided with a notch for hinge, and a pin hole for hinge is preset in the notch.
[0036] There are four connecting rods 30 in total, which are symmetrically arranged on the upper part and the lower part of the pulling rod. Both ends of the connecting rod 30 are provided with pin holes. The other ends of the upper two connec...
Embodiment 2
[0044] refer to Figure 4 , to further improve, before pouring concrete, put a blocking sheet 60 on the tie rod in advance, the blocking sheet is made of rubber film, has a certain elasticity, including elastic film and elastic sleeve, wherein the elastic sleeve and the tie rod cooperate, And for the tight fit, the fit is tight. After the pouring is completed, the plugging sheet forms a better waterproof effect, which is suitable for the underwater environment with a certain pressure, such as the waterproof occasions in water conservancy projects and river engineering, and has more positive significance.
[0045] According to actual needs, the above-mentioned blocking sheet can be designed into multiple channels to form multi-level waterproofing. In actual use of this design, the waterproofing level of the pull-bolt hole is better than the waterproofing performance of the building itself.