Embodiment 1
[0048] Example 1: A bottom flat car disassembly system for gates, such as figure 1 As shown, the disassembly platform 1 is included. On the disassembly platform 1, there are two slide rails 11 for the bottom flat car 8 to slide. The disassembly platform 1 is divided into a drilling station 2, a welding station 3, and a welding station from left to right. Cooling station 4, frame shaft extraction station 5 and sediment collection tank 6.
[0049] Such as figure 1 As shown, a drilling machine 21 is symmetrically arranged on both sides of the slide rail 11 on the drilling station 2 (see figure 2 ), the drill bit 211 of the drilling machine 21 (see figure 2 ) And frame axis 83 (see Figure 5 ) Are at the same height. Drill blind cooling holes 831 on the frame shaft 83 by the drilling machine 21 (see Image 6 ).
[0050] Such as figure 1 with 3 As shown, a screw barrel placement groove 31 and a welding manipulator 32 are symmetrically provided on both sides of the slide rail 11 on the...
Embodiment 2
[0054] Embodiment 2: A bottom-flat car disassembly process, using the bottom-flat car disassembly system in embodiment 1 for disassembly, the specific steps are as follows:
[0055] Step 1. Place the bottom flat car: place the bottom flat car 8 on the disassembly platform 1, and place the wheels of the bottom flat car 8 on the slide rail 11, remove the retaining ring 832 at the inner end of the frame shaft 83, and block it. The ring 832 is removed so as not to hinder the pulling out of the frame shaft 83;
[0056] Step 2: Drilling the frame shaft: the bottom flat car 8 slides along the slide rail 11 to the drilling station 2, the drilling machine 21 starts to work, and the sliding plate 7 is pushed to make the drilling machine 21 gradually move towards the frame shaft 83 axis direction and punch a cooling blind hole 831 on the frame axis 83 axis (see Image 6 );
[0057] Step 3. Welding of the frame shaft: the bottom flat car 8 slides along the slide rail 11 to the welding station 3...