Construction technology of composite structure layer of bridge deck of long-span cable structure bridge
A technology of construction technology and combined structure, applied in the direction of bridges, bridge parts, bridge construction, etc., can solve the problem of deck paving of steel bridge decks. The material and structure, technology, and quality control have not been fully solved, and the use effect is not very good. Good and other problems, to achieve the effect of not easy to permeate and corrode steel plate, high bond strength, good waterproof performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] A construction technology for the combined structure layer of a long-span cable structure bridge deck, the technical scheme is:
[0025] The process includes at least three parts: epoxy asphalt bonding layer construction process, pouring asphalt concrete construction process and epoxy asphalt concrete construction process. The construction process is:
[0026] Step A. Before construction, the bridge deck debris must be removed to ensure that the bridge deck or the lower bearing layer is dry, clean, free of oil, foreign matter, and dust. The surface temperature of the lower bearing layer is greater than 10°C. Before the construction of the epoxy asphalt waterproof bonding layer, the steel plate must be derusted and anti-corrosive treatment to reach Sa2.5 level, sprayed with epoxy zinc-rich paint, and reach the specified curing period before epoxy asphalt bonding Agent construction;
[0027] Step B. Epoxy asphalt binder coating, add epoxy asphalt and phenolic epoxy resin into t...
Embodiment 2
[0037] A construction technology for the combined structure layer of a long-span cable structure bridge deck, the technical scheme is:
[0038] The process includes at least three parts: epoxy asphalt bonding layer construction process, pouring asphalt concrete construction process and epoxy asphalt concrete construction process. The construction process is:
[0039] Step A. Before construction, the bridge deck debris must be removed to ensure that the bridge deck or the lower bearing layer is dry, clean, free of oil, foreign matter, and dust. The surface temperature of the lower bearing layer is greater than 10°C. Before the construction of the epoxy asphalt waterproof bonding layer, the steel plate must be derusted and anti-corrosive treatment to reach Sa2.5 level, sprayed with epoxy zinc-rich paint, and reach the specified curing period before epoxy asphalt bonding Agent construction;
[0040] Step B. Epoxy asphalt binder coating. Add epoxy asphalt and polybutadiene epoxy resin r...
Embodiment 3
[0050] A construction technology for the combined structure layer of a long-span cable structure bridge deck, the technical scheme is:
[0051] The process includes at least three parts: epoxy asphalt bonding layer construction process, pouring asphalt concrete construction process and epoxy asphalt concrete construction process. The construction process is:
[0052] Step A. Before construction, the bridge deck debris must be removed to ensure that the bridge deck or the lower bearing layer is dry, clean, free of oil, foreign matter, and dust. The surface temperature of the lower bearing layer is greater than 10°C. Before the construction of the epoxy asphalt waterproof bonding layer, the steel plate must be derusted and anti-corrosive treatment to reach Sa2.5 level, sprayed with epoxy zinc-rich paint, and reach the specified curing period before epoxy asphalt bonding Agent construction;
[0053] Step B. Epoxy asphalt binder coating, add epoxy asphalt and glycidyl ester epoxy resin ...