Anti-overturning reinforcement system for single-column pier bridges and mounting method
A reinforcement device and anti-overturning technology, applied in the direction of bridge reinforcement, bridge, bridge maintenance, etc., can solve the problems of the bearing emptying, the main beam overturning, etc., to ensure stable work, beautiful structure, and prevent bearing emptying and overturning. the effect of destruction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment 1 of the present invention will be described in detail below with reference to the accompanying drawings.
[0031] This embodiment provides an anti-overturning reinforcement device for a single-column pier bridge,
[0032] see attached figure 1 The device of the invention mainly includes: the reinforcement device at the bottom of the beam, the cantilevered steel structure device of the bridge pier and the rigid suspension rod connecting the two parts: the cantilevered steel structure device at the bridge pier is made of I-beam with reserved circular holes. 12. The semi-circular steel hoop 18 is composed of two semi-circular steel hoops connected by high-strength bolts 17 and fixed to the bridge pier 2 by anchor bolts 16; the semi-circular steel hoop 18 is provided with a vertical rib 15, which is In order to strengthen the axial rigidity of the semicircular steel hoop 18, the end of the I-beam 12 is provided with a through hole, the through hole is provided ...
Embodiment 2
[0038] Embodiment 2 of the present invention will be described in detail below with reference to the accompanying drawings
[0039] The present embodiment provides an installation method of an anti-overturning reinforcement device for a bridge with a single-column pier, including the following steps:
[0040] See Figure 8 :
[0041] Step 1, pre-assemble the semi-circular steel hoop 18 device, screw the two semi-circular hoop into some high-strength bolts for pre-assembly, and leave a certain gap with the bridge pier.
[0042] Before installation, add a rubber pad of a certain thickness according to the gap between the inner side of the steel hoop and the bridge pier to ensure that the steel hoop and the bridge pier are tightly fitted after step 2.
[0043] Step 2: Installation of the semi-circular steel hoop 18 device. The steel structure support is raised to a predetermined height, and the direction of the I-beam 12 is perpendicular to the tangential direction of the brid...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com