Hollow model and garden road construction process with application of hollow model
A road construction and model technology, applied to roads, roads, on-site coagulation pavements, etc., can solve the problems of road surfaces that do not meet the design requirements and stone pavement unevenness, shorten the construction period, reduce road damage, and improve The effect of flatness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Embodiment 1: A hollow model, including a model body arranged in a cuboid shape, the model body is hollow and the top is opened. The inner wall of the model body is provided with vertical ribs, and the vertical ribs 11 are evenly distributed at intervals.
[0045] A support structure is provided on the bottom wall of the hollow model 1 . The supporting structure is the protrusion 2 fixed on the bottom wall of the hollow model 1, and the protrusion 2 is arranged according to the positioning of the stone 16 in the design. The top of the hollow model 1 is provided with a cover plate 3 matching its cross-section. The cover plate 3 is provided with a circular limiting hole 31 , and the limiting hole 31 and the protrusion 2 are arranged correspondingly. A grouting opening 32 is opened on the cover plate 3 near the edge, and the side of the grouting opening 32 close to the edge of the cover plate 3 is inclined for grouting.
[0046] The hollow model 1 is made of steel, and can...
Embodiment 2
[0047] Embodiment 2, a hollow model, differs from Embodiment 1 only in that the support structure is different. The supporting structure is a steel frame 15. The steel frame 15 includes a rectangular steel wire mesh 151 and a support column 152 welded on the steel wire mesh 151. The steel wire mesh 151 and the support column 152 are vertically arranged, and the steel wire mesh 151 is located in the middle of the hollow model 1 . During use, the steel frame 15 is placed on the bottom wall of the model body.
Embodiment 3
[0048] Embodiment 3: a kind of garden road construction technique, comprises the following steps:
[0049] S1, making stone unit 4:
[0050] S1-1, pouring stone unit 4,
[0051] Apply a release agent on the inner wall of the hollow model 1 and the cover plate 3 on the side opposite to the hollow model 1, cover the cover plate 3 on the top of the hollow model 1, and insert the stone 16 into the limiting hole 31 on the cover plate 3. When using the hollow model of embodiment 1, the bottom of the stone 16 is supported on the top of the protrusion 2; when the hollow model of embodiment 2 is used, the bottom of the stone 16 is supported on the top of the wire mesh 151 . Then use the pumping grouting pipe to fill the hollow model 1 with cement mortar through the grouting port 32 until the cement mortar overflows from the grouting port 32 before stopping the grouting. According to the initial setting time of cement with different strengths, after the initial setting of the cement m...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


