Concrete and its preparation method
A concrete and unit technology, applied in the field of building construction, can solve the problems of reducing the water-binder ratio, increasing the heat of hydration, increasing cementitious materials, etc., and achieve the effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0029] The invention provides a method for preparing concrete. The concrete includes a slurry material and an aggregate material, the slurry material includes water, a cementitious material and an admixture, and the aggregate material includes coarse aggregate and fine aggregate. The preparation method of described concrete comprises the following steps:
[0030] S1: Determine the slurry content V per cubic meter of concrete p (%);
[0031] S2: Determine the water-binder ratio γ in the concrete mix, the amount of admixture ω (%), and the sand rate And the air content α (%) of concrete; Water-binder ratio γ, admixture dosage ω, sand rate And other parameters are determined according to the standard "Ordinary Concrete Mix Proportion Design Regulations".
[0032] S3: After determining the slurry content V p (%), concrete air content α (%), water-binder ratio γ, admixture content ω (%) and density ρ of water, cementitious material, admixture, fine aggregate and coarse aggreg...
Embodiment
[0060] Taking an actual project as an example, assuming that the air content of concrete is α=3%, the water-binder ratio is γ=0.32, and the sand ratio is Additive dosage ω=1%, suppose the densities of water, cementitious material, admixture, sand and stone are ρ w =1.0×10 3 kg / m 3 , ρ b =3.06×10 3 kg / m 3 , ρ a =1.06×10 3 kg / m 3 , ρ fa =2.62×10 3 kg / m 3 and ρ ca =2.72×10 3 kg / m 3 , the unit prices of water, cementitious material, admixture, sand and stone are P w = 5 yuan / ton, P b =317 yuan / ton, P a =3330 yuan / ton, P fa = 70 yuan / ton, P ca = 50 yuan / ton, then the relational expression between the concrete cost per cubic meter C (yuan / ton) and the slurry content is:
[0061]
[0062] like figure 1 Shown is a graph of concrete cost per cubic meter versus slurry content. For example, when the slurry content is 35%, the calculated cost per cubic concrete is 272.6 yuan, and the cost will drop by 3.809 yuan for every 1% reduction in the slurry content.
...