Partially prefabricated steel reinforced concrete mega-frame structure and construction method

A technology of prefabricated concrete and prefabricated assembly, which is applied in the direction of building structure and construction, and can solve the problems of complex force transmission mechanism of section connections, difficulty in ensuring connection quality, and high requirements for equipment tonnage, so as to solve the problem of insufficient overall continuity and improve shear The effect of force transmission and connection performance, simple and fast construction

Active Publication Date: 2018-11-06
XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
View PDF18 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, it should be noted that the fully prefabricated concrete structure also has many shortcomings.
First, since steel-concrete structures are mainly used in high-rise buildings and long-span buildings, the cross-sectional size of steel-concrete components is often relatively large, and the components are heavy in weight. The transportation and hoisting of fully prefabricated steel-concrete D...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Partially prefabricated steel reinforced concrete mega-frame structure and construction method
  • Partially prefabricated steel reinforced concrete mega-frame structure and construction method
  • Partially prefabricated steel reinforced concrete mega-frame structure and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] The implementation of the present invention will be described in detail below in conjunction with the drawings and examples.

[0052] The present invention is a partly prefabricated assembled steel concrete giant frame structure, which adopts the idea of ​​partially prefabricated assembled and partly cast-in-place, and is composed of a partially prefabricated giant assembled steel concrete outer frame and a prefabricated assembled concrete inner frame, such as Figure 1 to Figure 8 As shown, it includes: partly prefabricated giant prefabricated steel concrete beam prefabricated shell 1; partially prefabricated giant fabricated steel concrete column prefabricated shell 2; steel plate node core area connection device 3 connecting the upper and lower part of steel concrete column prefabricated shell 2; filling Cast-in-situ ordinary concrete 4 in the prefabricated steel concrete beam shell 1 and steel concrete column prefabricated shell 2; steel plate sleeve joint core area ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a partially prefabricated steel reinforced concrete mega-frame structure. The partially prefabricated steel reinforced concrete mega-frame structure adopts an idea of partiallyprefabricated assembly and partially cast-in-place and is composed of a partially prefabricated mega prefabricated steel reinforced concrete external frame and a prefabricated concrete internal frame. The partially prefabricated steel reinforced concrete mega-frame structure comprises partially prefabricated mega fabricated steel reinforced concrete beam and column prefabricated shells, cast-in-place common concrete filled in the prefabricated steel reinforced concrete beam and the column shells, steel plate sleeve and steel plate joint core area connecting devices connected with the prefabricated steel reinforced concrete beam and the column shells, prefabricated concrete beams and columns and cast-in-place high strength concrete filled in precast concrete beam and column joints. The invention further provides a construction method of the composite structure. The external frame adopts the partially prefabricated technology to improve the interface shear force transfer and connectionperformance between components and the overall continuity of the composite structure; and the internal frame improves the overall stiffness of the composite structure and reasonably divides the structural space. The combination of the external and internal frames enables the composite structure to be safe and reliable and is flexible in design.

Description

technical field [0001] The invention belongs to the technical field of construction, and in particular relates to a partially prefabricated assembled steel concrete giant frame structure and a construction method. Background technique [0002] The steel concrete structure refers to the steel-concrete composite structure formed by disposing steel in the section of the reinforced concrete member. Compared with the reinforced concrete structure, the steel concrete structure has significant advantages such as high bearing capacity, high rigidity, and good seismic performance due to the configuration of steel inside the reinforced concrete section; compared with the steel structure, because the steel is wrapped with concrete, the steel concrete structure has It has outstanding advantages such as low cost, high rigidity, good fire resistance and durability. Therefore, the steel concrete structure has the advantages of both concrete structure and steel structure. However, the con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04B1/30E04B1/58
CPCE04B1/185E04B1/30
Inventor 杨勇孙东德于云龙薛亦聪冯世强
Owner XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products