Ballast changing pillow machine
A technology of sleeper machine and sleeper crane, which is applied to roads, buildings, laying tracks, etc., can solve the problems of high labor intensity of sleepers, high labor intensity of workers, and long preparation time for operation, so as to save manpower, speed up sleeper replacement, and improve work efficiency. Reliability Guaranteed Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] Such as figure 1 , figure 2 As shown, it comprises a railroad car 1 with a rail wheel 11 that is rotated at the front and rear respectively, and a rail locking mechanism 2 matching with the rail is installed on the railcar 1. The railcar 1 is provided with front and rear grabs Pillow crane 3 and front and rear two ballast removers 4, two pillow grabbers 3 are respectively installed on the railway car 1, and front and rear ballast removers 4 respectively include a vertical sliding main body 41 and a ballast remover 42, vertically sliding The main body 41 is slidably installed on the railway car 1 along the up and down direction, and the vertical sliding main body 41 of the front and rear ballast removers 4 is respectively equipped with a high-frequency vibrator 5 that helps the ballast remover 42 to be inserted downward into the ballast, and vertically slides Between the main body 41 and the railway car 1, there are several lifting hydraulic cylinders 43 that drive the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

