A technology for thermal insulation boards and walls, applied in thermal insulation, building components, etc., can solve problems such as threats to people's lives and property, flammable thermal insulation materials, etc., and achieve the effects of easy recycling, good flame retardant effect, and good thermal insulation performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] A method for preparing an insulation board for building exterior walls. The insulation board is made of expanded polystyrene foam material. The insulation board is calculated in parts by weight and consists of the following components: 100 parts of EPS beads, phenolic aldehyde 100 parts of resin, 2 parts of phosphoric acid, 4 parts of p-toluenesulfonic acid, 4 parts of deionized water, 5 parts of fillers, 8 parts of inorganic flame retardants, and 9 parts of organic flame retardants. The preparation method of the insulation board is as follows:
[0018] The first step: pre-expansion, put the weighed EPS beads into the pre-expansion machine, control the steam pressure to 0.5MPa, control the pre-expansion temperature to 85°C, and control the pre-expansion time to 5 minutes;
[0019] The second step: curing, the above-mentioned pre-expanded EPS beads are placed in the air for 24 hours for curing;
[0020] The third step: prepare the flame retardant glue, add the weighed phenolic ...
Embodiment 2
[0027] A method for preparing an insulation board for external walls of a building. The insulation board is made of expanded polystyrene foam material. The insulation board is calculated in parts by weight and consists of the following components: 100 parts of EPS beads, phenolic aldehyde 100 parts of resin, 2 parts of phosphoric acid, 5 parts of p-toluenesulfonic acid, 3.5 parts of deionized water, 5 parts of fillers, 10 parts of inorganic flame retardants, and 12 parts of organic flame retardants. The preparation method of the insulation board is as follows:
[0028] The first step: pre-expansion, put the weighed EPS beads into the pre-expansion machine, control the vapor pressure to 0.3MPa, control the pre-expansion temperature to 80°C, and control the pre-expansion time to 2min;
[0029] The second step: curing, put the above-mentioned pre-expanded EPS beads in the air for 20 hours for curing;
[0030] The third step: prepare the flame retardant glue, add the weighed phenolic res...