Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Cement pavement fine friction course and construction method

A technology of cement pavement and construction method, which is applied in the direction of roads, roads, and coagulation pavement paved on site, can solve the problems of peeling, limited adhesion of cement pavement, easy aging, etc., to achieve excellent comprehensive performance and reduce maintenance costs. , The effect of solving peeling problems

Inactive Publication Date: 2018-11-27
CHONGQING SINCERE BOND PAVEMENT MATERIALS
View PDF20 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The bonding material described in this patent uses emulsified composite modified asphalt. It has been verified by practice that the bonding force of this type of material to the cement pavement is limited, and it is easy to age and cause peeling after a long time.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cement pavement fine friction course and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] A construction method for a fine anti-skid wear layer on a cement pavement, characterized in that the construction method comprises the following steps:

[0028] a. expressed in parts by weight, the fine anti-skid wear layer of the cement pavement consists of 100 parts of fine aggregate, 8 parts of epoxy cement, 16 parts of cement, 0.5 part of additive, and 12.5 parts of epoxy cement (by Chongqing Luidas Technology Co., Ltd.); the fine aggregate is basalt aggregate with a particle size of 5-8 mm;

[0029] b. Close the construction section, polish the old cement pavement, clean up the mud, oil, and laitance on the road surface, repair local diseases and clean the road surface;

[0030] c. Prepare various raw materials according to the proportion of ingredients for the fine anti-skid wear layer on the cement pavement, and use a special synchronous crushed stone sealing vehicle to mix epoxy cement, cement, and additives on site to form epoxy cement glue, and then mix them ...

Embodiment 2

[0036] A construction method for a fine anti-skid wear layer on a cement pavement, characterized in that the construction method comprises the following steps:

[0037] a. expressed in parts by weight, the fine anti-skid wear layer of the cement pavement consists of 100 parts of fine aggregate, 12 parts of epoxy cement, 20 parts of cement, 0.6 part of additive, and 10 parts of epoxy cement (by Chongqing Luidas Technology Co., Ltd.); the fine aggregate is basalt aggregate with a particle size of 5-8 mm;

[0038] b. Close the construction section, polish the old cement pavement, clean up the mud, oil, and laitance on the road surface, repair local diseases and clean the road surface;

[0039] c. Prepare various raw materials according to the proportion of ingredients for the fine anti-skid wear layer on the cement pavement, and use a special synchronous crushed stone sealing vehicle to mix epoxy cement, cement, and additives on site to form epoxy cement glue, and then mix them w...

Embodiment 3

[0045] A construction method for a fine anti-skid wear layer on a cement pavement, characterized in that the construction method comprises the following steps:

[0046]a. expressed in parts by weight, the fine anti-skid wear layer of the cement pavement is paved by 100 parts of fine aggregate, 16 parts of epoxy cement, 30 parts of cement, 0.8 part of additive, and 8 parts of modified emulsified asphalt (the oil-water ratio is 45%, produced by Chongqing Luidas Technology Co., Ltd.); the fine aggregate is basalt aggregate with a particle size of 5-8mm;

[0047] b. Close the construction section, polish the old cement pavement, clean up the mud, oil, and laitance on the road surface, repair local diseases and clean the road surface;

[0048] c. Prepare various raw materials according to the proportion of ingredients for the fine anti-skid wear layer on the cement pavement, and use a special synchronous crushed stone sealing vehicle to mix epoxy cement, cement, and additives on si...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
particle diameteraaaaaaaaaa
Login to View More

Abstract

The invention discloses a cement pavement fine friction course and a construction method. The fine friction course is paved by fine aggregates, an epoxy binder, cement, additives and a stabilizer. Theconstruction method comprises the following steps: closing a construction section, polishing old cement pavement, repairing local diseases and cleaning the pavement; then, blending the epoxy binder,cement and additives on the spot by adopting a special synchronous chip sealer to obtain epoxy cement, synchronously spraying the epoxy cement and fine aggregates onto the cement pavement to form an epoxy friction thin course, and rolling for 1-2 times by adopting a tire roller; spraying the stabilizer to the epoxy friction thin course by adopting an asphalt distributor after the epoxy friction course is cured, and handing over after the course is maintained and molded, and is qualified in inspection. The cement pavement fine friction course has the advantages of strong affinity with cement pavement, good binding force, water resistance, skid resistance, abrasion tolerance and the like, can be used for quickly repairing the surface structure of an old cement concrete pavement so as to improve the pavement skidding resistance and the pavement appearance.

Description

technical field [0001] The invention relates to the related field of maintenance and repair of cement concrete pavement, in particular to a fine anti-skid wear layer of cement pavement and a construction method. Background technique [0002] Cement concrete pavement is widely used in bridge and tunnel pavement because of its advantages of high strength, good stability and excellent construction environment. However, the macroscopic structure and microscopic texture of cement concrete pavement are gradually worn away shortly after it is opened to traffic, and the problem of anti-skid pavement is becoming more and more prominent. Especially, traffic accidents on bridges and tunnels occur frequently, and the driving safety of cement concrete pavement on bridges and tunnels has attracted much attention. [0003] Aiming at the anti-skid problem of cement concrete pavement of bridges and tunnels, the more commonly used maintenance method is the horizontal groove method, but the co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01C7/35C04B28/04
CPCC04B28/04C04B2111/00362C04B2111/00482C04B2111/0075E01C7/358C04B14/14C04B24/281C04B24/42C04B2103/0068
Inventor 吴祥燕刘帮银杨建萍胡鑫谌香玲
Owner CHONGQING SINCERE BOND PAVEMENT MATERIALS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products