Sealing material and sealing method for water inrush well breach in deep shaft working face of railway tunnel

A technology for plugging materials and working faces, used in sealing/isolation, wellbore/well components, earth-moving drilling, etc. Water flooded wells and other problems, to achieve excellent construction operability, good water blocking effect, and strengthen the overall strength of the effect

Active Publication Date: 2021-03-16
CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The method (1) is relatively simple, but for the flooded well depth greater than 300m and the water inflow greater than 200m 3 / h, the current pumping and drainage and supporting facilities are difficult to guarantee, and the operation safety risk during the construction process is extremely high, and the loss of the stratum and the expansion of the breach range cannot be caused by a large amount of pumping and drainage; method (2) ground deep hole pre-grouting method The construction period is long, the cost is high, and the construction is difficult. With the increase of the depth of the wellbore, it becomes more and more prominent and it is impossible to accurately expose the breach fissures and achieve the purpose of sealing the breach. Method (3) The freezing method construction has a long recovery period and a large investment for the wellbore, and after the wellbore is thawed Leakage and other problems are prone to occur; method (4) When the transportation distance of underwater concrete is greater than 200m, the concrete is prone to segregation, pipe plugging, diluted by groundwater, and the pouring quality is difficult to guarantee
[0003] When the above-mentioned methods are used to block the water inrush and breach of the vertical shaft, the requirements for the depth of the shaft's flooding, water inflow and stratum are relatively high, and the construction period of the ground pre-grouting and freezing method is long and the construction cost is high, which is difficult to meet the current rapid railway construction. The purpose of construction: with the rapid development of underground engineering in recent years, the construction of deep and large shafts is increasing day by day, and water inrush and flooding of wells will inevitably occur during the construction process. 3 / h well flooding accident, currently there is no fast and effective plugging material and method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Sealing material and sealing method for water inrush well breach in deep shaft working face of railway tunnel
  • Sealing material and sealing method for water inrush well breach in deep shaft working face of railway tunnel
  • Sealing material and sealing method for water inrush well breach in deep shaft working face of railway tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] The present invention is a sealing material for water inrush, flooding, and breach at the working face of a deep shaft of a railway tunnel, which is used for plugging the breach at the working face. The mass ratio of cement, water, SBT-NDA anti-dispersing agent and HME-III low-alkali expansion agent is: 1:(0.8~1):(0.02~0.03):(0.03~0.05); the working conditions are the above working surfaces In the position underwater more than 300m deep, and the burst water inflow is more than 200m 3 / h, but not limited to this condition, because there is no suitable plugging material under this condition. The applicant is an invention-creation made under this condition.

[0017] Preferably, the mass ratio of cement, water, SBT-NDA anti-dispersing agent and HME-III low alkali expansion agent is: 1:1:0.025:0.04. The specification of the cement is Portland cement, and the model is P42.5.

[0018] The invention also discloses the application of the above-mentioned railway tunnel deep sh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
compressive strengthaaaaaaaaaa
particle diameteraaaaaaaaaa
compressive strengthaaaaaaaaaa
Login to View More

Abstract

The invention discloses a railway tunnel deep shaft working face water burst and mine flooding breach blockage material and a blockage method and aims at being used for blocking working face breaches.The railway tunnel deep shaft working face water burst and mine flooding breach blockage material is prepared from cement, water, an SBT-NDA anti-dispersion agent and an HME-III low alkalinity type swelling agent with the mass ratio being 1 to (0.8-1) to (0.02-0.03) to (0.03-0.05); the working face is at the position with the depth larger than 300m underwater; and the water inflow of a breach islarger than 200m3 / h. The blockage material has better anti-dispersion performance, ensures that the material does not perform segregation and is not diluted in deep water, has better self-leveling performance and ensures to form a cylindrical water retaining cushion in the deep water.

Description

technical field [0001] The invention belongs to the technical field of tunnel engineering, and particularly relates to a plugging material and a plugging method for water inrush, flooding, and breach at the working face of a deep shaft of a railway tunnel. Background technique [0002] At present, after water inrush and flooding occurred in mines at home and abroad, the methods of blocking water inrush are divided into: (1) using pumping and drainage equipment to forcefully discharge to the inrush mouth to construct a water-stop pad; (2) pre-grouting plugging of deep holes on the ground (3) The freezing construction method is adopted; (4) The water-stop cushion is constructed by underwater concrete. Among them, method (1) is relatively simple, but for flooded well depths greater than 300m and water inflow greater than 200m 3 / h, the current pumping and drainage and supporting facilities are difficult to guarantee, and the operation safety risk during the construction proces...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): C04B28/04E21B33/13
CPCC04B28/04C04B2201/50E21B33/13C04B2103/408C04B2103/0068
Inventor 高广义贾建波宋涛罗占夫卓越李治国司景钊张俊冉海军邹建青周志辉翟康博郑德春王卓曹贵才谷晴天
Owner CHINA RAILWAY TUNNEL GROUP CO LTD