Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

272results about How to "Good water blocking effect" patented technology

Long tunnel fast construction process

The invention discloses a long tunnel fast construction process. The tunnel construction method in the direction from the entrance to the exit and the tunnel construction method in the direction from the exit to the entrance are the same and each construction section is respectively constructed from back to front. The construction process is as follows: 1, excavating construction at an initial construction section, the process is as follows: performing advance geology forecast, determining the excavating construction method for the current construction section, excavating and primary supporting; 2, excavating construction at the next construction section; 3, repeating the step 2 for multiple times until the construction tunnel is through, wherein in the tunnel construction process, found water seepage areas are timely subjected to draining treatment, and the secondary lining construction is synchronously performed on the tunnel holes formed by excavating from front to back. The long tunnel fast construction method is reasonable in design, simple and convenient in construction, safe in the construction process, short in construction process and fast in construction progress, thus effectively solving the defects and shortcomings such as large equipment investment, long construction period and slow construction progress of the existing long tunnel construction.
Owner:中铁二十局集团第二工程有限公司

Vertical shaft wall structure in bad stratum and construction device and method

The invention relates to a vertical shaft wall structure in a bad stratum and belongs to mine vertical shaft construction. The vertical shaft wall structure comprises a shaft arranged in the bad stratum and is characterized in that the upper shaft collar section of a vertical shaft is provided with a high-pressure-jet-grouting curtain pile shaft wall structure, a bedrock section is provided with a positioning targeting grouting section shaft wall structure and a shaft wall, and the upper and lower shaft wall structures are concentric, identical in diameter and tightly integrally connected to protect the shaft wall; the high-pressure-jet-grouting curtain pile shaft wall structure is provided with at least three circles of annular high-pressure-jet-grouting curtain walls with sealed heads and tails on the periphery, 0.6m away from a shaft outer diameter line, of the shaft outer diameter line by using the center of the shaft as the circle center, the positioning targeting grouting section shaft wall structure is provided with at least 8 positioning targeting grouting sections, vertical to the ground, on the periphery, 2m away from the shaft outer diameter line, of the shaft outer diameter line, and the two wall structures protect the shaft wall. The vertical shaft wall structure has the advantages that the vertical shaft wall structure is novel in concept, simple, stable and reliable; the high-pressure-jet-grouting curtain walls and the positioning targeting grouting sections protect the shaft wall, bearing capacity and deformation resistance are enhanced, and a good water blocking effect is achieved; the vertical shaft wall structure is fast and convenient in construction, fast shaft construction can be achieved, cost can be saved, and mine production can be performed safely and smoothly.
Owner:MAGANG (GROUP) HOLDING CO LTD

Chemical grouting material for coal-rock mass water shutoff and reinforcement and preparation method thereof

InactiveCN104498004AReduce the cost of water plugging and reinforcementRaw materials are cheap and easy to getDrilling compositionChemical synthesisChemical grouting
The invention belongs to the field of chemical synthesis, and particularly relates to a novel chemical grouting material for coal-rock mass water shutoff and reinforcement and a preparation method thereof. The chemical grouting material provided by the invention is prepared by mixing a component A and a component B at a volume ratio of 1:1, wherein the component A is prepared by proportionally mixing liquid sodium silicate, small-molecular alcohol and a catalyst; and the component B is prepared by proportionally mixing polyphenyl polymethylene polyisocyanate and a viscosity reducer. The chemical grouting material provided by the invention has the characteristics of low raw material cost, good permeability, fast curing, high adhesive force with a coal bed and high solidification strength; and particularly, the material does not foam in water, the water shutoff and reinforcement effects can be perfectly realized, the related raw materials are green and pollution-free, and the material does not contain volatile solvents or generate any poisonous gas and completely meets the requirements in use and environmental protection of coal mine water shutoff and reinforcement materials.
Owner:SHANDONG INOV NEW MATERIALS CO LTD

Crack plugging agent based on expansion particles and solidifiable particless

The invention discloses a crack plugging agent based on expansion particles and solidifiable particles, and belongs to the technical field of profile control and water plugging of an oil field. The crack plugging agent is composed of the expansion particles and the solidifiable particles which are separately stored, the mass ratio of the solidifiable particles to a solidification agent is 100:(5-20), and the content of the expansion particles is indefinite; the solidifiable particles are prepared from a solid core and film-coated resin in a mass ratio of 100:(5-15). The solidifiable particlesare high in strength, high in temperature resistance and salt tolerance and wide in oil reservoir applicability; an immovable plug formed by the solidifiable particles has an interception function ofa screen net, the breakthrough pressure gradient of the expansion particles in cracks can be obviously improved, the expansion particles are forced to remain in the cracks to continue to give play toa water plugging effect, meanwhile, the immovable plug has a penetration capacity, water, a gel breaker and the like are allowed to pass through the immovable plug so as to remove plugging of the expansion particles, and the crack plugging has restorability. The crack plugging agent has a good water plugging effect in water plugging of the oil field.
Owner:SOUTHWEST PETROLEUM UNIV

Nano micro-pore air purification net and preparation method thereof

InactiveCN104474808ANot easy to condensationExcellent anti-dust adsorption performanceDispersed particle filtrationParticulatesFiber
The invention discloses a nano micro-pore air purification net and a preparation method thereof. The nano micro-pore air purification net is made of a gauze element base material and a nano micro-pore membrane, wherein the nano micro-pore membrane is adhered to the gauze element base material and is made of cured colloid and nano fiber short chopped strands; the nano fiber short chopped strands are adhered to the cured colloid in a criss-cross manner, thereby forming micro-pores of which the diameters range from 0.1 micron to 2.5 microns. Therefore, when external air enters a room through the nano micro-pore air purification net, granules of which the diameters are greater than 2.5 microns can be baffled outside the room; due to adoption of nano fiber, pollen can be effectively isolated, and intense ultraviolet light can be also cut off; dew is not easy to form on the nano micro-pore membrane, and even when attached to the nano micro-pore membrane, rain cannot be blown into the room easily. As the nano fiber is subjected to special fluorine treatment in the preparation process, the nano micro-pore air purification net can be automatically cleaned when water or rain is sprayed on the nano micro-pore membrane without detachment, and dirt adhered to the nano micro-pore membrane can be easily blown off by using an air blower.
Owner:JIANGSU SANDING ENVIRONMENT TECH

A high dam and large reservoir ultra-deep water retaining and venting system and its operating method

ActiveCN105220659BSolve the key technical problems in the design of deep water retaining and ventingImprove securityBarrages/weirsReservoir engineeringWater flow
The invention discloses a high dam reservoir ultra-deep water retaining and emptying system and an operation method thereof. The water retaining and emptying system comprises first to last stage gate systems and a last stage radial gate system, and the first to last stage gate systems are sequentially arranged on a tunnel; each stage gate system is provided with communicating pipes with water supplement and draining functions, and the communicating pipes perform water flow control by means of valves; all the stages of gate systems achieve water pressure and air pressure balance through the inner and outer communicating pipes, the outer maintaining communicating pipes, ventilation pipes, galleries and the like of the gate systems respectively; the last stage gallery is communicated with the down stream of the water retaining and emptying system through a gallery shaft. The operation method includes four working conditions of water storing, water emptying, maintaining and water retaining. According to the high dam reservoir ultra-deep water retaining and emptying system and the operation method thereof, multiple stages of gates are disposed so as to share burden with a gross head; water filling is performed in rear of each stage of gate so as to counteract the pressure of water retaining heads, and hydraulic thrust which each stage of gate tolerates can be kept within a conventional design range; the defects of metal structures in the prior art can be overcome; the key technical problem of ultra-deep water retaining and emptying designs in the high dam reservoir engineering can be solved.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD

Machine for forming underground continuous water-retaining walls by one step

The invention discloses a machine for forming underground continuous water-retaining walls by one step, which relates to a machine for building underground continuous water-retaining walls on mudflat sections and dam bodies beside rivers, lakes and seas. The machine comprises a tracked chassis, a stand, a turning angle chassis, a grooving system installed on the turning angle chassis, a bar arrangement system, a concrete pouring basin, a power system installed on the stand, an electrical apparatus control cabinet and a hydraulic control cabinet, wherein the grooving system is a chain-type uninterrupted clamshell excavator which can ascend upwards, descend downwards, keep upright in operation and lie obliquely on the stand in transition transporting; and the bar arrangement system and the concrete pouring basin are arranged at the back side of the grooving system. The machine can complete all the operations of digging ground grooves, arranging steel bars and pouring concrete. The machine provided with a diesel engine is fitted with an on-vehicle concrete mixer and has the advantages of flexible transition operation and high working efficiency. The depth of a wall body is adjustable, and a formed wall has favorable quality. The machine can also utilize commercial power of a construction site as power.
Owner:ANHUI WENPENG HEAVY ENG MACHINERY CO LTD

Water bursting emergency water blocking method and water blocking device

The invention relates to a water bursting emergency water blocking method and a water blocking device, and discloses a water blocking method and device, wherein the water blocking device is fixedly mounted by cooperating with anchor rods, and blocking is conducted through airbag inflating expansion. The water bursting emergency water blocking method is characterized by comprising the steps: the water blocking device is expanded, and the four corners of the water blocking device are connected and fastened with the support anchor rods; an outer connecting sleeve on the water blocking device communicates with an external pump body; a layer of anchor mesh is laid on the surface where the water blocking device is fixed, and fixed through the anchor rods, and the water blocking device is fixed;the water blocking device is filled by starting the external pump body; the water blocking device is gradually expanded, meanwhile, the anchor mesh is fastened, the expanded water blocking device is fixed, and thus the water blocking device can be tightly attached to the rock wall initially; and the water blocking device is completely filled and completely attached to the rock wall, emergency water blocking is completed, and subsequent reinforcement work is conducted. The water blocking method is simple, mounting and fixing are conducted based on the original support anchor rods, and the situation that fixing lacks in supporting is avoided.
Owner:TAIYUAN UNIV OF TECH

Displacement exploitation method for heavy oil reservoir after artificial foam oil primer and steam flooding

The invention provides a displacement exploitation method for heavy oil reservoir after artificial foam primer and steam flooding. The method comprises: selecting a target oil reservoir and a target well group; stopping a well group steam injection and oil exploitation process, and injecting an artificial foam oil primer slug and a gas slug into injection wells; opening wells to exploit oil when formation pressure rises so that bottom-hole static pressure of a production well reaches a set value; after injecting the gas slug, continuing the inject steam to the injection wells, judging whether injection transfer conditions and lower economic limit are satisfied or not, and determining whether to continue oil exploitation or stop oil exploitation. By using an artificial foam oil primer in the method, it is possible to reduce crude oil viscosity and surface tension for a near-wellbore formation, gas is dispersed in micro bubble form in oil-in-water emulsion, rheological properties of crude oil are improved, oil-gas-water to-be-mixed phase fluid is formed, elasticity energy is supplemented to the formation, overall mobility of fluid in the oil reservoir is improved, mobility of crude oil is improved, and single-well productivity and final recovery are increased.
Owner:PETROCHINA CO LTD

Method and combination device for controlling profile and blocking water for thickened oil horizontal well of screen pipe well completion

The invention relates to a combination device for controlling a profile and blocking water for a thickened oil horizontal well of screen pipe well completion. The combination device comprises a perforation device, a chemical plugging pipe column and a mechanical plugging pipe column which are arranged at a preset position in a horizontal well of the screen pipe well completion sequentially and alternatively. The chemical plugging pipe column is formed by a first plug, a first packer, an explosive relief valve and a second packer sequentially, an oil pipe with certain length is connected between the two packers, and the explosive relief valve is connected with the inside the oil pipe between the two packers. The mechanical plugging pipe column is formed by a second plug, a production screen pipe, a cutting uniflow valve, a third packer and a fourth packer sequentially, and an oil pipe with certain length is also connected between the third packer and the fourth packer. By means of a combination method of chemical plugging outside a horizontal slotted screen and mechanical plugging inside the horizontal slotted screen, validity of water blocking is prolonged, a water blocking effect of the screen pipe well completion is improved, oil producing capacity of an water-emerging thickened oil horizontal well is recovered, and a problem of water emerging of the thickened oil horizontal well of the existing screen pipe well completion is solved.
Owner:PETROCHINA CO LTD

Automatic-and-manual combined type water retaining device and water retaining method thereof

The invention discloses an automatic-and-manual combined type water retaining device and a water retaining method thereof. The water retaining device comprises a base and an automatic water fender rotatably arranged on the base, and is characterized in that the water retaining device further comprises one or more manual water fenders used for being detachably mounted on the upper portion of the automatic water fender, and the bottoms of the manual water fenders used for being connected with the automatic water fender can be attached to the free end of the automatic water fender. The method includes the first step of triggering the automatic water fender for giving out an alarm, the second step of preparing installation of the manual water fenders, the third step of installing the manual water fenders, the fourth step of dismounting the manual water fenders and the fifth step of resetting the manual water fenders. The automatic-and-manual combined type water retaining device and the water retaining method thereof have the beneficial effects that the automatic water fender and the manual water fenders are combined, on the one hand, people have enough time to rush to the water retaining device, and on the other hand, the number of the manual water fenders is determined according to the rainfall, so that the effect that rainwater cannot enter underground buildings is guaranteed to the maximum extent, and the automatic water fender can be effectively detected at ordinary times.
Owner:NANJING JUNLI TECH

Box type water retaining dam for coal mine underground reservoir

The invention discloses a box type water retaining dam for a coal mine underground reservoir. The box type water retaining dam is located between coal pillar dam bodies on the left side and the rightside of a roadway and used for isolating the underground reservoir and the roadway and blocking a water source in the underground reservoir. The box type water retaining dam comprises a main dam bodyand water retaining wings, wherein the main dam body is of a box type structure, the left side and the right side of the main dam body are embedded in the coal pillar dam bodies on the two sides, thetop of the main dam body is embedded in roadway roof surrounding rock, and the bottom of the main dam body is embedded in roadway bottom plate surrounding rock; and the water retaining wings compriseside wings, the side wings are connected with the left side and the right side of the main dam body and arranged along at least the whole height range of the main dam body, the side wings are embeddedinto the coal pillar dam bodies on the two sides to a certain depth, and thus side wing seepage prevention areas are formed. The box type water retaining dam can reduce crippling and water seepage caused by excessive local stress of the surrounding rock at the same time, adjusts differential settlement, prevents the surrounding rock from being softened due to water entering, and ensures the stability and safety of the dam bodies.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Sound wave method testing method for tunnel surrounding rock loosening circle

The invention provides a sound wave method testing method for a tunnel surrounding rock loosening circle. The method comprises the following steps: drilling a test drill hole in tunnel surrounding rock, arranging the grouting type bags on the upper inner wall and the lower inner wall of the drilled hole, placing the hole sealing pipe in the drilled hole, forming a grout overflowing opening and a grout outlet in the outer wall of the hole sealing pipe, enabling a testing instrument to penetrate through the hole sealing pipe, injecting grout into the grouting type bags through the grout outlet,and after grout in the grouting type bags reaches specific strength, injecting the slurry through the grout overflowing opening, injecting water into the hole sealing pipe, after the whole drilled hole is filled with the water, using the water as a coupling agent, using a testing instrument to emit sound waves to tunnel surrounding rock of the tunnel surrounding rock, and determining the range ofthe tunnel surrounding rock loosening circle according to the change condition of the reflection wave velocity of the tunnel surrounding rock. Aiming at complex geology, high ground stress areas and loose and broken surrounding rocks, the invention provides the method for testing the loose circle of the tunnel surrounding rocks by the acoustic wave method, the water plugging effect is improved through the hole sealing pipe, and the hole protection section ensures the drilling stability.
Owner:BEIJING JIAOTONG UNIV +1

Water resistant high-voltage cable and production method thereof

The invention discloses a water resistant high-voltage cable and a production method thereof. The cable comprises a cable core and a cable core sleeve wrapped on the cable core. The cable core comprises a plurality of conductors. Fragile water resistant belts are wound on the conductors. Each fragile water resistant belt comprises semi-conducting fragile non-woven fabric and water resistant powder. The water resistant powder is wrapped in the semi-conducting fragile non-woven fabric. When the cable core is stressed, the semi-conducting fragile non-woven fabric is smashed, the water resistant powder fills gaps among the conductors. The production method of the water resistant high-voltage cable includes the steps of producing the cable core and the cable core sleeve. When the cable core is produced, the fragile water resistant belts are wound on the conductors, each fragile water resistant belt comprises the semi-conducting fragile non-woven fabric and the water resistant powder, and the water resistant powder is wrapped in the semi-conducting fragile non-woven fabric. The cable core of the water resistant high-voltage cable adopts the fragile water resistant belts, and the water resistant powder is wrapped in the semi-conducting fragile non-woven fabric and can be filled in the gaps among the conductors of the cable core so that the water resistant high-voltage cable achieves good powder adhesion effect and has optimal water resistant effect.
Owner:广州岭南电缆股份有限公司

Water plugging method of establishing large-area chemical partition plate in gas-water interface of water-bearing gas reservoir

The invention relates to a water plugging method of establishing a large-area chemical partition plate in a gas-water interface of a water-bearing gas reservoir. The method comprises the following steps that (1) an aqueous-phase solution is injected into a gas-water interface of a gas reservoir and is transported to a water layer under the effect of diffusion and dispersion; (2) an oil-phase solution is injected into the gas-water interface of the gas reservoir and is spread in the gas-water interface to replace the gas-water interface with an oil-water interface; (3) an aqueous-phase monomeris diffused towards the oil layer, and a region, close to an oil phase, of the oil-water interface generates polymerization reaction with an oil-phase monomer to form a microporous polymer interlayer;and (4) formation water permeates into the polymer interlayer under the effect of a pressure difference, and mineral ions and impurities continuously deposit to form scales on the polymer interlayerto form a water-impermeable polymer interlayer. The method is reliable in principle and simple and convenient to operate, can effectively solve the problems of small plugging range, low plugging strength and the like of a common water plugging system in the process of water invasion treatment of the edge-bottom water-bearing gas reservoir and has a great practical significance of efficient miningthe edge-bottom water-bearing gas reservoir.
Owner:SOUTHWEST PETROLEUM UNIV

Water plugging method and device for gushing water in gap of steel sheet pile cofferdam

The invention belongs to a water plugging method and device for water gushing in a gap of a steel sheet pile cofferdam. The device is composed of steel sheet piles, and the water plugging device for water gushing of the gap of the steel sheet pile cofferdam comprises a gap inflation water plugging structure or an inflation extrusion inner water plugging structure. The gap inflation water plugging structure is composed of a groove and an inflation bag, the groove is longitudinally formed in the lock catch position of the steel sheet pile, and the inflation bag is arranged in the groove; or the gap inflation water plugging structure is composed of an expansion bag and an inflatable bag with a protective layer. The air inflation extrusion inner water plugging structure is composed of a U-shaped steel plate, an extrusion plate, a water stop belt, a screw rod, an inner threaded hole and a handle. According to the method, only one inflation bag needs to be arranged at the lock catch position of every two adjacent steel sheet piles, if water leaks from the lock catch positions of the steel sheet piles, gas or liquid is injected into the inflation bags located at the water leakage lock catch positions through gas injection ports to enable the inflation bags to expand to block water leakage gaps at the lock catch positions, and water leakage blocking is achieved. The device is novel and simple in structure and design, good in using effect, low in water plugging cost and fast in water stopping.
Owner:NO 1 ENG CO LTD OF FHEC OF CCCC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products