Wall type filled mining method applicable to flat-pitch phosphorus deposit
A technology of filling mining and gentle inclination, which is applied in the direction of filling, ground mining, mining equipment, etc., which can solve the problems of increasing the difficulty of filling material preparation and transportation, improve mining safety, reduce filling costs, and cut ratio small effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073] Embodiment 1, a wall filling mining method suitable for gently inclined phosphate rock deposits,
[0074] The mining sequence of this method is to start mining from one side of the panel in reverse order, and fill while mining.
[0075] The mining operation space is always supported by the filling body formed by filling and the unmined mine wall (ore body). The exposed area of the roof of the empty area is small, which effectively improves the mining safety.
[0076] During mining, the panel is divided into mining rooms of the same or different widths, and the mining rooms are advanced in sequence.
[0077] The panel area is arranged along the ore body trend, and the mine houses in the panel area are arranged along the ore body tendency; the length L of the panel area is 200m-1km; the width D of the panel area is 200m-500m.
[0078] The top and bottom pillars are respectively set up and down the panel, and the width of the top and bottom pillars is 10m~20m; the mine ...
Embodiment 2
[0090] Embodiment 2, a wall filling mining method suitable for gently inclined phosphate rock deposits,
[0091] For example: A phosphate mine in Hubei adopts a wall-fill mining method.
[0092] 1. According to the occurrence of the ore deposit and the layout of the development system, the design parameters of the stope structure are as follows:
[0093] ⑴Panel width (along the direction): 400m
[0094] ⑵Panel length (along the direction): 200m
[0095] ⑶ Top column of the panel: 20m
[0096] ⑷ Panel bottom column: 20m
[0097] ⑸ Interval column: 20m
[0098] ⑹Width of security pillar in ramp: 20m
[0099] ⑺Width of mine room (pillar): 10m;
[0100] ⑻The length of mine house (pillar): 160m
[0101] 2. Accurate cutting
[0102] A middle roadway is arranged every 200m along the dipping direction of the ore body, and the length of the panel is 200m. A panel is arranged every 400m along the direction of the ore body. For each panel, a 20m wide top column is reserved at t...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Width | aaaaa | aaaaa |
| Diameter | aaaaa | aaaaa |
| Hole depth | aaaaa | aaaaa |