Precast-spliced UHPC pipe-concrete super-high pier and construction method thereof

A concrete and ordinary concrete technology, applied in bridges, bridge parts, bridge construction, etc., can solve problems such as the decline in bearing capacity and durability of bridge piers, the decline in economic benefits of super-high bridge piers, and the addition of more mechanical equipment, etc., to achieve component ductility performance Improvement, strong chemical corrosion resistance and convenient construction

Active Publication Date: 2019-01-11
HUNAN UNIV
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The prefabricated concrete-filled steel tube section in this connection structure needs to be hoisted by a large-tonnage crane. If parallel operations are used in order to speed up the construction period, more investment in mechanical equipment will be added, and the resulting high costs will greatly reduce the economic benefits of super-high bridge piers
[0004] In addition, reinforced concrete super-high piers are prone to be in a state of large eccentric bending and compression stress. When the pier is eccentrically compressed, the pier body is prone to cracks, and the internal stressed steel bars are more likely to corrode when exposed to the external environment, which makes the bearing capacity and durability of the pier Significant decline in sex

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Precast-spliced UHPC pipe-concrete super-high pier and construction method thereof
  • Precast-spliced UHPC pipe-concrete super-high pier and construction method thereof
  • Precast-spliced UHPC pipe-concrete super-high pier and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0036] refer to Figure 1~7, the prefabricated and spliced ​​UHPC pipe-concrete superhigh bridge pier of the present invention includes several UHPC pipe prefabricated sections 1 and ordinary concrete 2 poured in the UHPC hollow pipe prefabricated section, and the UHPC pipe prefabricated section 1 adopts UHPC The UHPC hollow pipe body formed by pouring, the upper pipe wall of the hollow pipe body is reserved with planting reinforcement holes 6, and the lower pipe wall is pre-embedded with high-strength steel bars 3. 6 are matched in depth; tooth blocks 4 are arranged at intervals on the inner wall of the hollow tube body, and high-strength steel mesh 12 is laid between adjacent tooth blocks 4 .

[0037] The transverse reinforcement of the high-strength steel mesh 12 is implanted into the wall of the hollow pipe body, and the high-strength steel mesh 12...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a precast-spliced UHPC pipe-concrete super-high pier, comprising a plurality of sections of UHPC pipe precast segments and plain concrete cast in the UHPC hollow pipe precastsegments, wherein the UHPC pipe prefabricated segment is a UHPC hollow pipe body cast by UHPC, a reinforcement hole is reserved in the upper pipe wall of the hollow pipe body, and high-strength steelbars are embedded in the lower pipe wall, and the extension length of the high-strength steel bars matches the depth of the reinforcement hole; the UHPC pipe prefabricated segment is a UHPC hollow pipe body cast by UHPC. The inner side wall of the hollow pipe body is spaced with tooth blocks, and high-strength reinforcing steel mesh is laid between adjacent tooth blocks. The UHPC pipe in the super-high bridge pier makes the ordinary concrete (NSC) in a three-directional compression state, greatly improves the compressive strength of the ordinary concrete (NSC), has good durability and excellent mechanical performance, and also discloses a precast spliced UHPC pipe. The construction method of concrete super-high bridge pier is simple in construction procedure, short in period, lower in equipment investment cost and high in construction efficiency.

Description

technical field [0001] The invention belongs to the field of bridge engineering, and in particular relates to a prefabricated spliced ​​UHPC pipe-concrete superhigh pier and a construction method. Background technique [0002] At present, super-high bridge piers at home and abroad generally have problems such as long construction period, poor construction convenience, excessive investment in erection and climbing formwork, and poor mechanical performance of the pier body. In addition, during the construction of super-high bridge piers, as the height of the pier body increases, the construction period will also become longer accordingly, resulting in increased construction costs and safety risk factors. Especially for municipal bridges, the construction period is too long, which is harmful to the city. Traffic has a great impact, causing inconvenience for residents to travel, and even causing traffic accidents. [0003] Existing super-high bridge piers adopt construction met...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine