A technology for tunnels and roofs, applied in construction, artificial islands, infrastructure engineering, etc., can solve the problems of long construction period, waste of resources, consumption, etc., achieve saving of building materials and construction period, high vertical bearing capacity, and settlement settlement problem effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as Figure 1-8 As shown, the tunnel constructed in this embodiment is a double-hole tunnel, and the specific design and construction method includes the following steps:
[0038] S10. Design and construction of tunnel side wall 2 and middle partition wall 3
[0039] Calculation and analysis are carried out according to the stress conditions of the tunnel side wall 2 as a temporary support structure during the tunnel construction process and as a permanent structure after completion. According to the calculation and analysis results, the most unfavorable working condition is taken as the design of the tunnel side wall 2 Requirements, the construction of the tunnel side wall 2 is carried out using the conventional underground diaphragm wall construction method.
[0040] It can be seen that the tunnel side wall constructed by this method not only considers the status of the temporary structure during the construction period, but also considers the force status of the...