Construct and construction method of preventing pavement around manhole from subsiding
A construction method and inspection well technology, which can be used in infrastructure engineering, soil protection, construction, etc., can solve the problems of poor backfill around the inspection well and road subsidence.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] When the pipeline groove is backfilled to the bottom surface level of the road base 6, an annular groove 8 is dug out on the periphery of the inspection well 1, the inner diameter of the annular groove 8 is the same as the outer diameter of the inspection well 1, and the outer diameter is increased by 1000 mm outside the inner diameter. That is, the ring width is 1000 millimeters, and the depth of the annular groove 8 is 250 millimeters. Six grouting holes 9 are evenly distributed in the middle of the annular groove 8 around the inspection well 1, and the grouting holes 9 adopt a drilling rig to drill holes with a diameter of 100 millimeters and a depth close to the bottom of the well. Put a grouting pipe 2 in each grouting hole 9, and the grouting pipe 2 adopts the steel pipe processing of diameter 25 millimeters, and the bottom will be sealed, and on the pipe wall of the grouting pipe 2, every 100 millimeters are uniformly drilled. Four small holes of 5mm are threaded...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com