A construction technology and anti-sill mold of adjustable turnover type kitchen and bathroom anti-sill
A construction process and technology for kitchen and toilet, which is applied in the field of adjusting the construction technology of revolving kitchen and toilet anti-sill and its anti-sill mould, can solve the problems of difficult to guarantee construction quality, easy deviation of formwork, waste of materials, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] as attached Figure 1~2 As shown, firstly, the original construction design drawings of multiple projects or the actual construction site are combined to conduct comprehensive analysis and calculation of the pouring foundation of the reverse sill, and draw the design drawing of the mold according to the data and conclusions obtained from the calculation; secondly, according to the steps A The prepared construction drawing is processed to make the pouring formwork, and the plate with a thickness of not less than 0.2cm is selected to make the main formwork 1 with a length of 20cm and a height of 10cm, and the adjustment formwork 2 with a length of 30cm and a height of 10~30cm The connectors 3 are provided with connection holes 8 at both ends of the main formwork 1, adjustment holes 7 are provided at the middle and upper part of the adjustment formwork 2, and number Each mounting hole connecting the formwork bracket 5 is provided with at least one reinforcement rib on the ...
Embodiment 2
[0051] as attached Figure 1~2 As shown, firstly, the original construction design drawings of multiple projects or the actual construction site are combined to conduct comprehensive analysis and calculation of the pouring foundation of the reverse sill, and draw the design drawing of the mold according to the data and conclusions obtained from the calculation; secondly, according to the steps The construction drawing obtained in A is processed to make the pouring formwork, and the plates with a thickness of not less than 0.2cm are selected to make the main formwork 1 and the adjustment formwork 2 with a length of 60cm and a height of 20cm, and a connection with a length of 70cm and a height of 20cm. Part 3, connection holes 8 are provided at both ends of the main formwork 1, adjustment holes 7 are provided at the middle and upper part of the adjustment formwork 2, and several connection holes are respectively arranged on the upper part or the top of the main formwork 1 and the...
Embodiment 3
[0055] as attached Figure 1~2 As shown, firstly, the original construction design drawings of multiple projects or the actual construction site are combined to conduct comprehensive analysis and calculation of the pouring foundation of the reverse sill, and draw the design drawing of the mold according to the data and conclusions obtained from the calculation; secondly, according to the steps A. The prepared construction drawing is processed to make the pouring formwork, and the plate with a thickness of not less than 0.2cm is selected to make the main formwork 1 and the adjustment formwork 2 with a length of 100cm and a height of 30cm, and make a connection with a length of 110cm and a height of 30cm. Part 3, connection holes 8 are provided at both ends of the main formwork 1, adjustment holes 7 are provided at the middle and upper part of the adjustment formwork 2, and several connection holes are respectively arranged on the upper part or the top of the main formwork 1 and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com