Sand core installation structure and installation method of vehicle box body
An installation structure and installation method technology, applied in the field of sand core manufacturing, can solve the problems of sand core fracture and unstable positioning, and achieve the effects of improving stability, convenient positioning and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Please refer to Figure 1 to Figure 4 As shown, this embodiment provides a sand core installation structure for a vehicle box, including an upper mold 1, a front side mold 2, a rear side mold 3, a left side mold 4, a right side mold 5, and a lower mold 6 and the metal base 7 arranged on the lower mold 6, the metal base 7 is provided with a shunt hole 8, the material of the metal base 7 is a metal part resistant to high temperature and high pressure, preferably H13 mold steel, which has high structural strength and can stably support other sand molds Compared with the traditional sand mold base, it has better support stability, and it is not easy to be washed by aluminum water for a long time at high temperature, which will cause the base sand to fall off easily.
[0036] Please combine figure 1 with figure 2 As shown, the sand core structure includes a main sand core 9, a water channel sand core 10, a small water channel sand core 11, a cross sand core 12 and a lap s...
Embodiment 2
[0047] This embodiment provides an installation method for the above-mentioned vehicle box sand core installation structure, and the specific installation steps are as follows:
[0048] Step (a): Use a resin adhesive to bond the bent portion 111 at the lower end of the small channel sand core 11 to the main sand core 9 for positioning; and use the first core head boss at the upper end of the small channel sand core 11 to insert Positioning is carried out in the first embedding groove on the upper end of the sand core 9; the height of the first core head boss is 19mm, and the depth of the first embedding groove is 14mm, so that after positioning, it can effectively ensure that the core body of the small channel sand core 11 is in line with the main body. The distance between the sand cores 9 is 5mm; and the positioning distance between the upper and lower ends of the small channel sand core 11 and the main sand core 9 is 340mm; this structural design is based on the design of th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com