ONBA-based cloud manufacturing task minimum production time scheduling method
A technology of production time and scheduling method, applied in the field of computing, can solve problems such as not taking into account, local optimum, insufficient search accuracy, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The present invention will be described in further detail below in conjunction with the examples, but the protection scope of the present invention is not limited thereto.
[0037] The present invention relates to a method for scheduling the shortest production time of cloud manufacturing tasks based on ONBA. The new bat algorithm based on two order oscillation (ONBA) of the present invention is based on the new bat algorithm (NBA) proposed in 2010. The algorithm improved by adding the second-order oscillation and the introduction of the differential evolution algorithm not only considers the effective management of online information resources, but also assigns the offline sub-tasks to different enterprises for processing, resulting in logistics distribution problems added to the algorithm model.
[0038] The method includes the following steps.
[0039] Step 1: The user uploads a large task to the cloud manufacturing platform.
[0040] Step 2: The cloud manufacturin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com