Method for measuring tunneling construction precision at two ends of extra-long tunnel
A technology for precision measurement and tunneling, which is applied in measurement devices, measurement instruments, radio wave measurement systems, etc., and can solve problems such as affecting the accurate penetration of tunnels and increasing penetration errors of tunnels excavating in opposite directions.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Huangzhukou Tunnel is an extra-long tunnel on the Hezhou-Bama Expressway in Guangxi. It is located about 200m south of Huangzhukou Village, Wenzhu Town, Zhaoping County, Hezhou City. The exit is located in the east of Guanshetun, Wachong Village, Xihe Town, Mengshan County, Wuzhou City. At about 100m, it is a separate over-the-ridge super-long tunnel. The overall direction of the tunnel is about 266°. The start and end pile numbers of the right tunnel are YK68+925~YK73+682. The design length is 4757m, and the maximum buried depth is about 310.593m (YK72+740); The starting and ending stakes of the left tunnel are ZK68+930.6~ZK73+695, the design length is 4764.4m, and the maximum buried depth is about 300.602m (at ZK72+720). method for measurement, the specific steps are as follows:
[0042] (1) Analysis of the status quo of re-measurement points
[0043] Before the retest of the control network, the on-site survey is first carried out to check the integrity of the marke...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com