A construction management application platform based on the application of BIM technology

A technology for construction management and application platform, applied in data processing applications, instruments, resources, etc., can solve problems such as property loss affecting the life safety of construction workers, injuries to construction workers, and complicated electromechanical installation projects, so as to shorten the project duration, reduce Effects of construction changes and project cost control

Pending Publication Date: 2019-03-29
GUANGDONG CONSTR CO LTD OF CHINA RAILWAY NO 3 ENG GRP CO LTD +1
View PDF0 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the scale and specialization of industrial production, it can be seen that the development level of science and technology is continuously advancing by leaps and bounds. In today's construction projects, the management of construction progress, quality, safety, environment, etc. The management of the original personnel is gradually transformed into the management of the oriented buildings; when it is in the environment of a super-large covered vehicle depot, the environment is a large-scale infrastructure. In the construction management, there are large-scale civil works, complex electromechanical installation projects, and multiple processes. , multiple intersections, and tight schedules, there are many problems that need to be solved, such as environmental protection, quality, safety, cost, and progress control; however, the technical personnel on the project are generally young and have insufficient construction experience, which leads to the level of on-site construction site management. It is relatively low, and it is impossible to scientifically and rationally allocate human and machine resources; the current common measure is to use BIM technology to participate in the construction. BIM technology can make up for the lack of experience to a certain extent, and the use of BIM technology can optimize the construction plan in advance. Optimize the construction process and present the construction progress in real time with 3D visualization; however, when it comes to super-large covered depots,

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction management application platform based on the application of BIM technology
  • A construction management application platform based on the application of BIM technology

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0036] A construction management application platform based on the application of BIM technology, which is applied to the construction in super-large covered depots, mainly includes workstations, servers, management systems, wireless routers, and construction equipment arranged in the construction site, which are arranged in the control room. The workstation and the server are connected with the construction equipment through a wireless router to form wireless communication transmission control. The management system is a WEB-side BIM collaborative management platform, installed in the workstation, and provides data transmission services through the server; wherein the main working modules of the management system are It includes a database of logical operation, a model access module, a simulation building module, a collision correction module and a construction guidance module; the database is used to store the modeling information of the super-large covered depot, the construc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction management system, especially a construction management application platform based on the application of BIM technology. The construction management applicationplatform mainly comprises a workstation, a server and a construction equipment which are connected with each other through a wireless router to form a wireless communication transmission control. Theconstruction equipment mainly comprises a mobile terminal equipment, a support and hanger, a folding ladder, a detachable protective fence, a transport trailer, a marking machine, a pipe installationdevice and a positioning member. The positioning member is a steel frame member whose quantity matches the building information; The supporting and hanging bracket is fixedly installed between two adjacent spaced-apart walls; The folding ladder and the detachable protective fence are arranged on the outer periphery of the building information; Transportation trailers, marking machines, and pipe installations are movably arranged in the galleries of the building information spaced apart from each other; Through the management system, the modeling software and the construction equipment, the invention timely provides accurate guidance on the geometrical positions of the components, the engineering quantities and the like for the key processes such as the progress management and the on-sitecoordination in the construction process, thereby helping to control the project cost and improve the quality.

Description

technical field [0001] The invention relates to a construction management system, in particular to a construction management application platform based on BIM technology application. Background technique [0002] With the scale and specialization of industrial production, it can be seen that the development level of science and technology is making continuous and leaping progress. In today's construction projects, the management of construction progress, quality, safety, environment, etc. The management of the original personnel is gradually transformed into the management of the oriented building; when it is in the environment of the super-large covered depot, the environment is a large-scale infrastructure. In the construction management, there is a large amount of civil engineering, complicated electromechanical installation engineering, and multiple processes. There are many problems that need to be solved urgently, such as environmental protection, quality, safety, cost...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06313G06Q10/103G06Q50/08
Inventor 耿少鹏连双伟王振华郭振方李俊杰李子华田勇欣张天兰平
Owner GUANGDONG CONSTR CO LTD OF CHINA RAILWAY NO 3 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products