A kind of method of tbm construction segment back closed loop
A technology of closed ring and back, which is applied in the field of closed ring at the back of TBM construction segment, which can solve the problems of high calculus rate, high water loss and poor operability, and achieve the effect of short initial setting time, high calculus rate and less water loss
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0050] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0051] The initial setting time of the cement-water glass slurry in the prior art is not easy to control, and the cement-water glass slurry loses a lot of water during the coagulation process, and the rate of stone formation is high, which will cause additional settlement to the building.
[0052] In view of the above problems, the present invention will be described in detail below in conjunction with the technical solutions.
[0053] Such as figure 1 As shown, the method for the TBM construction segment back closed ring provided by the embodiment of the present invention includes:
[0054] S101: Use a double-liquid grou...