[0019] Such as figure 1 As shown, the present embodiment provides a long auger bored pile method, the step S1: according to the design drawing of the pile location, measure the axis of the pile location, the positioning point, and make a mark; step S2: wait for the drilling rig to be in place Finally, drill into the hole to be constructed; Step S3: Carry out pressure grouting to concrete, and during pressure grouting, after reaching the end hole of the design pile bottom elevation, first pump in concrete and stop for a specified time, then promote the drilling rig drill pipe; step S4: after the concrete grouting is completed, insert the reinforced cage made in advance to the design depth until the grouting pile is formed, and the filling coefficient of the grouting pile is 1.0-1.2.
[0020] In the method of the long helical drilling and grouting pile described in this embodiment, in the step S1, according to the design drawing of the pile location, the axis of the pile locatio...