Integrated plant for producing power cable and rubber sleeve cable

A power cable and rubber sleeve technology, which is applied in the field of factory planning and design in the wire and cable industry, can solve the problems of unguaranteed product quality and safe production, large investment in fixed assets, and high operating costs, so as to reduce investment in fixed assets and improve labor productivity. The effect of reducing the number of logistics

Active Publication Date: 2019-05-07
乔治国
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to complex products and cumbersome process routes, the process turnover distance in the wire and cable production process is long, and many equipments need to be involved in lifting and transportation. Small output ratio, high production cost
Shortcomings such as product quality and safety production cannot be guaranteed
[0003] The disadvantages of the traditional method are: (1) split workshop, high cost of factory construction
(2) Each workshop is self-contained, and the investment in equipment fixed assets is large
(3) Between the workshops, the material circulation distance between the processes is long, and the operating cost is high
(4) The management is complicated, the personnel occupation is large, and the production efficiency is low. (5) The product quality and safe production cannot be guaranteed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integrated plant for producing power cable and rubber sleeve cable
  • Integrated plant for producing power cable and rubber sleeve cable
  • Integrated plant for producing power cable and rubber sleeve cable

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.

[0025] Such as Figure 1-8 As shown, a comprehensive factory building for producing power cables and rubber-sheathed cables according to an embodiment of the present invention includes a main workshop 2, and one end of the main workshop 2 is provided with a vertical tower workshop 4, and the main workshop 2 The other end is provided with a catenary workshop 5, two auxiliary workshops 3 are arranged on both sides of the main workshop 2, the main workshop 2 is a single-layer single-span structu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an integrated plant for producing a power cable and a rubber sleeve cable. The integrated plant comprises a main workshop, wherein one end of the main workshop is provided witha vertical tower workshop, the other end of the main workshop is provided with a catenary workshop, the two sides of the main workshop are provided with at least one auxiliary workshop, the two endsof the auxiliary workshop are communicated with the vertical tower workshop and the catenary workshop respectively, and the integrated plant is internally provided with at least one rubber sleeve cable insulating sheath production line and at least one cable insulating core production line. The integrated plant for producing the power cable and the rubber sleeve cable have the advantages that thecost of investment is saved, the problem that the head and tail of production processes cannot be taken into consideration is solved, the labor productivity is improved, the transportation efficiencyis high, and the transportation cost is saved; a specialized conductor channel reduces the damage of a semi-finished product, the stereoscopic and unified transportation of an insulating sheath material reduces the pollution of the material, and the management is efficient; the production cost is low, the production efficiency is high, and the personnel occupation is less.

Description

technical field [0001] The invention relates to the field of factory planning and design in the electric wire and cable industry, and specifically relates to a comprehensive factory building for producing power cables and rubber-sheathed cables. Background technique [0002] The factory planning and equipment layout of the domestic wire and cable industry basically imitated the model of the former Soviet Union. Most of them are composed of separate workshops. The workshops are divided by process and products. They are roughly divided into wire drawing workshop, conductor stranding workshop, high-voltage cable workshop, medium-voltage cable workshop and rubber sheath cable workshop. Wait. Each workshop has a separate factory building, and each workshop is equipped with its own complete set of equipment. Each workshop is an independent subsystem. Due to the complex products and cumbersome process routes, the process turnover distance in the wire and cable production process...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04H5/02H01B13/00H01B13/02H01B13/14H01B13/24
Inventor 乔治国
Owner 乔治国
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products