Unlock instant, AI-driven research and patent intelligence for your innovation.

Deep Well Point Connection Structure and Construction Method of Old and New Sewage Pipelines

A sewage pipe and point connection technology, which is applied in the field of sewage pipes, can solve problems such as the inability of vehicles to drive, nowhere to discharge water, and excessive water accumulation on the road, and achieve the effect of shortening the construction time and increasing the length

Active Publication Date: 2020-07-03
ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the long construction period of the new and old sewage pipes, there is nowhere to discharge the cut-off sewage, which will have an adverse impact on the original environment. If it is serious, it will cause too much water accumulation on the road and make it impossible for vehicles to drive.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Deep Well Point Connection Structure and Construction Method of Old and New Sewage Pipelines
  • Deep Well Point Connection Structure and Construction Method of Old and New Sewage Pipelines
  • Deep Well Point Connection Structure and Construction Method of Old and New Sewage Pipelines

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0049]The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0050] The deep well point connection structure of old and new sewage pipelines includes foundation pit support structure, inspection well structure of old and new sewage pipelines and sewage pipeline suspension device.

[0051] The foundation pit support structure includes steel sheet piles 10, drainage ditch 11, support plate 18, support plate 19, cross bar 20, diagonal brace 21 and groove 22; support plate 18 and diagonal brace 21 are welded on steel sheet pile ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a new and old sewage pipeline deep well point connection structure which comprises a foundation pit supporting structure, a new and old sewage pipeline inspection well structure and a sewage pipeline suspension device. The foundation pit supporting structure comprises steel sheet piles, drainage ditches, bracing plates, supporting plates, transverse rods, inclined struts and grooves. The new and old sewage pipeline inspection well structure comprises a blocking pipe, a solid base, a fixed base, a split bolt hole, a solid block, an old pipe communicating pipe, a new pipe communicating pipe, a splicing circular ring, a splicing circular groove and a well chamber. The sewage pipeline suspension device comprises a sliding rail, a sliding collecting machine, a top connecting transverse rod, a lifting rope, a sliding wheel, a supporting column, a lifting ring, an outwards-extending rail and a lifting hook. The invention has the beneficial effects that the three communicating pipes arranged on the inspection well are matched with the blocking pipe, so that continuous flow construction of new and old sewage pipes can be realized. The inspection well is constructedin an assembling mode, and the construction time is greatly shortened.

Description

technical field [0001] The invention relates to the field of sewage pipes, in particular to a deep well point connection structure and construction method of old and new sewage pipes. Background technique [0002] Underground sewage pipes are pipes buried underground for transporting sewage discharged from the upper part, and are used in cities, roads, sewage plants, underground projects, etc. During the use of sewage pipes, it needs to be repaired, and some severely damaged pipelines need to be replaced. What's more, the original pipelines need to be discarded and new sewage pipes should be used to replace the old sewage pipes. During the construction of traditional new and old sewage pipes, the sewage discharge function of the old sewage pipe is permanently closed, and then the construction of the new sewage pipe is carried out, and finally the two pipes are connected together at the intersection of the old and new sewage pipes. Due to the long construction period of the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E03F3/06E03F5/02E02D17/04E03F3/04
Inventor 刘要武杜海峰孙学军彭申凯任杰钱申春崔健
Owner ANHUI HIGHWAY BRIDGE ENG CO LTD