Efficient plug valve for oil drilling
A technology for oil drilling and plug valve, which is applied in wellbore/well valve device, earthwork drilling, wellbore/well components, etc. The effect of efficient and fast adjustment, convenient operation and maintenance, and low processing difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] A high-efficiency plug valve for oil drilling includes a valve body 1, a lower valve seat 2, a spring 3, a knob 4, a ball 5, an upper valve seat 6, a pressure ring 7, an upper limit surface 6-1, a lower limit surface 2-1, The opening positioning surface 4-1 and the closing positioning surface 4-2, wherein the valve body 1 is a round tube with threads processed at both ends, and the inner hole is sequentially processed from top to bottom with two steps, an annular groove and a third There are three steps, the hole below the first step is threaded, the thread is fixed with a pressure ring 7, a radial step hole is processed in the annular groove, the knob 4 is housed in the hole, and the spring 3 is supported on the lower step of the annular groove. , the lower valve seat 2, the sphere 5, and the upper valve seat 6 are sequentially installed on the top of the third step. The long strip-shaped protrusion on the right part of the knob 4 is inserted into the long groove in the...
Embodiment 2
[0023] The difference from Embodiment 1 is that the high-efficiency plug valve for oil drilling has a hexagonal wrench hole processed on the left end surface of the knob 4 .
Embodiment 3
[0025] The difference from Embodiments 1 and 2 is that the high-efficiency plug valve for oil drilling has a spring 3 set on the outer circle of the lower step of the lower valve seat 2 .
[0026] Connect the high-efficiency cock valve for oil drilling into the drill string, connect the mud channel, turn the knob 4 counterclockwise with a special wrench, and the knob 4 drives the ball 5 to rotate counterclockwise. When the opening positioning surface 4-1 and the upper limit surface 6-1 Or when the lower limit surface 2-1 is in contact with each other, the plug valve is fully opened, and the mud channel is opened at this time, and the mud flows smoothly into the lower drilling tool. When overflow or blowout occurs, use a special wrench to rotate the knob 4 90 degrees clockwise, When the closing positioning surface 4-2 is in contact with the upper limit surface 6-1 or the lower limit surface 2-1, the cock valve is in a completely closed state, cutting off the mud passage, prevent...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

