An automatic bolting device for coal mine
A bolt and coal mine technology, which is applied in the field of partial realization devices, can solve the problems of wasting time, increasing the risk of roadway collapse, and lengthy support process time, etc., and achieve the effect of short switching process time and high efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] refer to Figure 1 to Figure 14 Further elaborating the present invention, an automatic bolting device for coal mines, including an anchoring agent base connecting plate 301, a fixed base 302, a fixed base slide rail 303, a fixed base slider 304, a slide rail turntable 305, and a drill pipe base connection Plate 306, drill pipe base 307, drill pipe push rod one 308, drill pipe push rod two 309, drill pipe top seat 310, drill pipe manipulator 311, drill pipe top column 312, anchor rod push rod two 313, anchor rod top seat 314, Anchor manipulator 315, Anchor top post 316, Anchor push rod two 317, Anchor push rod one 318, Anchor push rod one 319, Anchor base 320, Anchor base 321, Anchor base connecting plate 322 , Drill base fixed vertical plate 323, fixed connecting plate 2 324, anchor base fixed vertical plate 325, drill box 1 326, drill box base 1 327, anchor belt 328, anchor linear guide 329, anchor base fixed vertical Plate carriage 330, drill pipe base fixed vertica...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


