Construction process of clean workshop pipeline
A construction technique and clean workshop technology, applied in the field of high-clean workshop processing, can solve the problems of low air cleanliness in clean rooms, affecting the use of workshops, and high dust generation, so as to avoid waste of resources, avoid waste of time, and improve effectiveness Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0017] In order to make the technical means, creative features, goals and functions achieved by the present invention clearer and easier to understand, the present invention will be further elaborated below in conjunction with specific embodiments:
[0018] A pipeline construction process for a clean workshop, comprising the following construction steps:
[0019] S1. Prefabrication and installation of clean outdoor pipeline supports and hangers: set up supports and hangers at the beginning of the air duct and the connection with the same equipment, and support the vertical outer pipelines on each floor with supports and hangers. When the floor height is ≥ 5m, two supports and hangers should be installed The opening of the frame and the hanging bracket is matched with a bench drill and a hand drill;
[0020] S2. Manufacture and hoisting of clean outdoor pipelines: the main pipes of the clean outdoor pipelines are made of galvanized steel pipes, the branch pipes are made of stai...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com