A kind of anti-seepage and water-proof method in hydraulic engineering
A water conservancy project and water stop technology, which is applied in water conservancy projects, sea area projects, infrastructure projects, etc., can solve the problems of huge dam construction projects and the inability to effectively prevent water leakage from the dam body, and achieve the effect of improving the anti-seepage ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] A method for preventing seepage and sealing water in hydraulic engineering, comprising the following steps:
[0024] Step 1. After the main structure of the dam body of the water conservancy project is solidified, use an excavator to excavate a 0.5-meter-deep and 0.5-meter-wide gully at the bottom one meter inside the dam body, and level the soil in the gully to make the whole gully regular;
[0025] Step 2: Cover the inner surface of the dam body with a layer of stainless steel wire mesh with a diameter of 3mm, fix the wire mesh on the inner surface of the dam body with rivets, then make a concrete formwork, and fix the concrete formwork on the top of the stainless steel wire mesh, The distance between the concrete formwork and the stainless steel wire mesh is 10cm;
[0026] Step 3, select the time period when the temperature is lower than 25 degrees Celsius to make concrete, select cement and quicklime powder with low heat of hydration as raw materials, and add anti-s...
Embodiment 2
[0034] A method for preventing seepage and sealing water in hydraulic engineering, comprising the following steps:
[0035] Step 1. After the main structure of the dam body of the water conservancy project is solidified, use an excavator to excavate a 0.5-meter-deep and 0.5-meter-wide gully at the bottom one meter inside the dam body, and level the soil in the gully to make the whole gully regular;
[0036] Step 2: Cover the inner surface of the dam body with a layer of stainless steel wire mesh with a diameter of 5 mm, fix the wire mesh on the inner surface of the dam body with rivets, then make a concrete formwork, and fix the concrete formwork on the top of the stainless steel wire mesh, The distance between the concrete formwork and the stainless steel wire mesh is 20cm;
[0037] Step 3, select the time period when the temperature is lower than 25 degrees Celsius to make concrete, select cement and quicklime powder with low heat of hydration as raw materials, and add anti-...
Embodiment 3
[0044] A method for preventing seepage and sealing water in hydraulic engineering, comprising the following steps:
[0045] Step 1. After the main structure of the dam body of the water conservancy project is solidified, use an excavator to excavate a 0.5-meter-deep and 0.5-meter-wide gully at the bottom one meter inside the dam body, and level the soil in the gully to make the whole gully regular;
[0046] Step 2: Cover the inner surface of the dam body with a layer of stainless steel wire mesh with a diameter of 4mm, fix the wire mesh on the inner surface of the dam body with rivets, then make a concrete formwork, and fix the concrete formwork on the top of the stainless steel wire mesh, The distance between the concrete formwork and the stainless steel wire mesh is 15cm;
[0047] Step 3, select the time period when the temperature is lower than 25 degrees Celsius to make concrete, select cement and quicklime powder with low heat of hydration as raw materials, and add anti-s...