Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Device and method for treating overfilled concrete of underwater bored pile in advance

A technology for drilling cast-in-place piles and pouring concrete, which is applied to sheet pile walls, buildings, infrastructure projects, etc., can solve problems such as environmental noise and atmospheric pollution, increase construction period costs, and twist and deform steel bars, and achieve a short construction operation time. , avoid noise pollution, the effect of low construction risk

Inactive Publication Date: 2020-02-18
SUBWAY ENG CO LTD OF CHINA RAILWAY 16TH CONSTR BUREAU +2
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This treatment method has certain disadvantages: 1) Since the concrete has reached a certain strength, the difficulty of demolition in the later stage will increase, which will increase labor and mechanical costs and increase construction safety risks; A large amount of dust was generated during the process, which caused noise and air pollution to the environment; 3) The demolition of overfilled concrete became a key process, which increased the construction period of the project; The process leads to twisting and deformation of the steel bar, which needs to be straightened in the later stage, which increases the cost of the construction period and affects the mechanical properties of the steel bar; It is difficult to control the angle of pile head during processing, hanging and pulling, and it is very easy to break the main reinforcement of the reinforcement cage

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Device and method for treating overfilled concrete of underwater bored pile in advance
  • Device and method for treating overfilled concrete of underwater bored pile in advance
  • Device and method for treating overfilled concrete of underwater bored pile in advance

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.

[0026] (1) Device design for advanced treatment of overfilled concrete for underwater bored piles

[0027] Taking the cast-in-situ pile with a diameter of 800mm as an example, the reinforced protective layer of the pile body is 50mm, the diameter of the main reinforcement is 16mm, and the diameter of the reinforcement stirrup is 20mm. 50mm×50mm grid-shaped steel sheet that can be opened and closed upwards (opening angle is less than 90°).

[0028] (2) Device processing for advance treatment ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a device and method for treating overfilled concrete of an underwater bored pile in advance. The device comprises a barrel of which the cross section is rectangular, and the bottom end of the barrel is welded at the bottom surface; the bottom surface is provided with a plurality of rectangular grooves; and one side of each rectangular groove is connected with a steel sheetthrough a hinge. According to the device and method for treating the overfilled concrete of the underwater bored pile in advance, the purpose of chiseling away the head of a concrete pile before finalsetting of concrete is achieved, and manual chiseling of the pile head and chiseling operation of the pile head with a large chiseling machine are not required; the construction risk is low; the construction time for chiseling away the pile head is short, and the construction period is not affected; and no secondary disturbance occurs to steel bars.

Description

technical field [0001] The invention relates to the technical field of concrete pouring, in particular to a device and method for advance treatment of overfilled concrete of underwater bored piles. Background technique [0002] In order to ensure the quality of poured concrete, the underwater bored piles generally have an overfilling height of not less than 0.5 meters of concrete, and the overfilling concrete will be chiseled off later. [0003] The traditional treatment method of super-filled concrete is: after the concrete pile body is completely poured, the earthwork is excavated to the base, and the super-filled concrete is manually and mechanically broken. This treatment method has certain disadvantages: 1) Since the concrete has reached a certain strength, the difficulty of demolition in the later stage will increase, which will increase labor and mechanical costs and increase construction safety risks; A large amount of dust was generated during the process, which ca...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D9/00E02D5/40
CPCE02D5/40E02D9/04
Inventor 陈建王兵杨世鹏刘卫强王佳宁李媛王妍
Owner SUBWAY ENG CO LTD OF CHINA RAILWAY 16TH CONSTR BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products