Cantilever pull rod assembled triangular bracket and construction method thereof

A triangular bracket and assembled technology, which is applied in the erection/assembly of bridges, bridges, buildings, etc., can solve problems such as difficult large-scale promotion, dangerous difficulty, and hidden safety hazards, and achieve convenient and quick operation, wide application range, and safety high effect

Pending Publication Date: 2020-02-28
NANJING RUNHUA MUNICIPAL CONSTR CO LTD +1
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The bridge bracket is used to support the formwork and bear the construction load when the bridge is poured into 0# block. The traditional bracket pre-embeds a large steel plate in the pier, and the triangular bracket is assembled and welded under the bridge. Buried steel plate welding, but the traditional bracket has high-altitude vertical welding during the construction process, the quality of the weld is difficult to guarantee, and there are safety hazards, and the weld is long, the workload of high-altitude welding is large, and the installation period of the bracket is long. Therefore, it is necessary to study a A bridge bracket that is safe, convenient, sustainable and highly efficient
[0003] The current bridge brackets are mainly connected to the bridge piers through connectors. For example, the Chinese patent "201721822376.6" discloses a bridge bracket, including a steel sleeve with a snap-in groove, a support plate, an insertion ring groove and an adapter clip. The installation steel sleeve is fixed on both sides of the pier through the inserting ring groove and the matching clip ring, and the support plate is installed on the installation steel sleeve through the card slot, which simplifies the installation process and improves the efficiency. However, it is difficult to install the two sides separately. To ensure the symmetry of the bracket, a protruding ring must be provided at the bridge pier, which protrudes from the pier body and affects the appearance; another example is the Chinese patent "201822039683.8" which discloses a bridge construction support bracket, including the first tie rod, the second tie rod, the first With three tie rods and two support units, this structure does not require pre-embedded steel plates in the pier, does not damage the quality of the pier, and has a high bearing capacity. However, more components bring inconvenience to the installation, and the support units on the ground are in special conditions such as muddy and water surfaces. It cannot be used under certain circumstances, and there are limitations; another example is the Chinese patent "201520263654.3", which discloses a bridge bracket structure, including horizontal support rods, diagonal stay rods, support sleeves, and fixing holes. This structure does not require embedded parts. At the upper end of the bridge pier, the steel sleeve is tightly hooped on the pier, and then the bracket is welded on the bracket, which reduces the support strength and load of the bridge bracket. However, each pier needs to drill a large number of fixing holes. Difficult to promote on a large scale
[0004] In summary, the existing bridge pier bracket structure or application scenarios are limited, or high-altitude operations are required, dangerous and difficult, or time-consuming and laborious. Therefore, it is necessary to research and develop a bridge bracket structure that is easy to install and operate, safe and efficient

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cantilever pull rod assembled triangular bracket and construction method thereof
  • Cantilever pull rod assembled triangular bracket and construction method thereof
  • Cantilever pull rod assembled triangular bracket and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] like Figure 1-Figure 2 As shown, a cantilever pull rod assembled triangular bracket includes a bridge pier column 1, a triangular bracket 2, a hole-forming pipeline 3, an upper pull rod 41, a lower rod 42, and a supporting bracket 5. Each set of triangular brackets 2 consists of Horizontal bars 21, inclined bars 22, and vertical bars 23 are assembled in the factory or on site to form a right-angled triangular frame, and three pairs of supporting supports 5 are symmetrically pre-embedded on the two side walls of the bridge pier column 1 in the direction of the bridge. The bottom end of the vertical rod 23 of the triangular bracket 2 is fixedly supported on the supporting support 5, and the upper and lower two hole-forming pipelines 3 are horizontally arranged in the bridge pier column 1 to form two upper and lower horizontal tunnels, and the axis of the hole-forming pipeline 3 is along the Along the direction of the bridge, the upper pull rod 41 and the lower rod 42 res...

Embodiment 2

[0051] like image 3 As shown, a cantilever pull rod assembled triangular bracket includes a bridge pier column 1, a triangular bracket 2, a hole-forming pipeline 3, an upper pull rod 41, a lower rod 42, and a supporting bracket 5. Each set of triangular brackets 2 consists of Horizontal bars 21, inclined bars 22, vertical bars 23, and web bars 25 are assembled in the factory or on site to form a right-angled triangular frame, and three pairs of supporting supports 5 are symmetrically pre-embedded on the two side walls of the bridge pier column 1 along the bridge direction. , the bottom end of the vertical rod 23 of the triangular bracket 2 after the overall assembly is fixedly supported on the supporting support 5, and the upper and lower two hole-forming pipelines 3 are horizontally arranged in the bridge pier column 1 to form two upper and lower horizontal channels, and the hole-forming pipelines The axis of 3 is along the direction along the bridge, and the upper tie rod 4...

Embodiment 3

[0053] like Figure 4 As shown, a cantilever pull rod assembled triangular bracket includes a bridge pier column 1, a triangular bracket 2, a hole-forming pipeline 3, an upper pull rod 41, a lower rod 42, and a supporting bracket 5. Each set of triangular brackets 2 consists of Horizontal bars 21, inclined bars 22, and vertical bars 23 are assembled in the factory or on site to form a right-angled triangular frame, and three pairs of supporting supports 5 are symmetrically pre-embedded on the two side walls of the bridge pier column 1 in the direction of the bridge. The bottom end of the vertical bar 23 of the triangular bracket 2 is fixedly supported on the supporting support 5, and the upper, middle and lower three hole-forming pipes 3 are horizontally arranged in the bridge pier column 1 to form three upper, middle and lower horizontal tunnels. And the axis of the hole-forming pipeline 3 is along the bridge direction of the bridge, the upper tie rod 41, the middle tie rod 4...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a cantilever pull rod assembled triangular bracket. The cantilever pull rod assembled triangular bracket comprises a bridge pier column, a triangular bracket, a pore-forming pipeline, an upper pull rod, a lower pull rod and a supporting support, wherein the pore-forming pipeline and the supporting support are embedded before concrete pouring of the bridge pier column, andhorizontal rods, inclined rods and vertical rods are connected and assembled in advance to form the triangular bracket. After concrete pouring and curing are completed, upper and lower pull rods are inserted into the pore-forming pipe, the triangular bracket is hoisted to the upper part of the supporting support and temporarily fixed, and the upper and lower pull rods are tensioned to anchor the triangular bracket to the side wall of the bridge pier column to form the cantilever pull rod assembled triangular bracket. The upper and lower pull rods are inserted into the bridge pier column as connecting pieces to ensure the stress symmetry and stability of the triangular brackets on both sides of the pier column, and the supporting support under the triangular brackets can provide vertical support for the triangular brackets. According to the cantilever pull rod assembled triangular bracket, the structure is simple and convenient to operate, the components can be recycled, the bearing capacity and the stability are high, and the structure has wide application prospect.

Description

technical field [0001] The invention belongs to the field of civil engineering, and relates to a bridge construction bracket, in particular to a cantilever pull rod assembled triangular bracket and a construction method thereof. Background technique [0002] The bridge bracket is used to support the formwork and bear the construction load when the bridge is poured into 0# block. The traditional bracket pre-embeds a large steel plate in the pier, and the triangular bracket is assembled and welded under the bridge. Buried steel plate welding, but the traditional bracket has high-altitude vertical welding during the construction process, the quality of the weld is difficult to guarantee, and there are safety hazards, and the weld is long, the workload of high-altitude welding is large, and the installation period of the bracket is long. Therefore, it is necessary to study a A bridge bracket that is safe, convenient, sustainable and highly efficient to install. [0003] The cur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 梁安东江一飞陈伟侯定兵汪亮魏洋朱超