Method for controlling water and soil loss of watershed by adjusting runoff of slope surface
A technology for slope runoff and watershed, applied in chemical instruments and methods, excavation, water supply devices, etc., can solve the problems of poor slope stability, failure to comprehensively consider supporting measures such as retaining, storage, and drainage, and enhance slope stability. performance, solve the problem of slope water sources, and improve productivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0017] Specific implementation mode 1: This implementation mode is a method for controlling water and soil loss in a watershed by regulating slope runoff, specifically carried out according to the following steps:
[0018] A plurality of field ridges are evenly arranged on the slope from upstream to downstream, and a drainage groove is arranged in parallel next to the field ridge at the downstream of each field ridge; a drainage ditch is dug downward on the ground at a side edge of the slope, and the The drainage ditch is arranged along the slope from upstream to downstream, and the drainage ditch is parallel to the direction along the slope; a grit chamber is dug downward at the bottom of the drainage ditch, and a grit chamber is set up 3 to 5 ridges apart; Downstream and set the first water outlet and the first water inlet on the side wall of the drainage ditch away from the field ridge, and set a layer of filter screen at the first water outlet; dig a reservoir on the ground...
specific Embodiment approach 2
[0019] Embodiment 2: This embodiment is different from Embodiment 1 in that: a 15cm-20cm thick sand cushion is laid on the bottom surface of the drainage ditch, and then a U-shaped groove made of glass fiber reinforced plastic is placed. Others are the same as the first embodiment.
specific Embodiment approach 3
[0020] Embodiment 3: This embodiment is different from Embodiment 1 or Embodiment 2 in that: the width of the drainage ditch is 30cm-35cm, and the depth of the drainage ditch is 30cm-35cm. Others are the same as those in Embodiment 1 or 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com