Method and system for sharing connecting multiple drill jumbos
A technology of a rock drilling rig and an online system, which is applied in the field of shared online methods and systems of multiple rock drilling rigs, can solve the problems of restricting tunnel efficiency, time-consuming and laborious drilling work, and achieve avoidance of repeated operations, improvement of efficiency, and The effect of ensuring uniformity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] An embodiment of the present invention provides a shared online method for multiple rock drilling rigs, which is applied to a scene of cooperative drilling operations for multiple rock drilling rigs. The working environment in this embodiment is a working face in the tunnel, the working task is to drill a certain number of holes on the working face, and the working equipment is the multiple rock drilling rigs.
[0047] see figure 1 , the shared online method of multiple rock drilling rigs includes the following steps:
[0048] Step 101, establishing communication connections between multiple rock drilling rigs to form a sharing network;
[0049] Step 102, upload the drilling outline to the sharing network, and share it with all rock drilling rigs;
[0050] Step 103, positioning the rock drilling rig, and uploading the positioning data to the sharing network for sharing;
[0051] Step 104, each rock drilling rig performs drilling operations according to the drilling o...
Embodiment 2
[0072] see Figure 5 , the present invention also provides a shared online system for multiple rock drilling rigs, which includes multiple rock drilling rigs, wherein each rock drilling rig is provided with a data communication port 20, a positioning module 30, a data acquisition module 40 and control module 50.
[0073] The data communication port 20 is used to establish communication connection and data sharing with other rock drilling rigs, the positioning module 30 is used to locate the rock drilling rig, and the data acquisition module 40 is used to collect the data of the rock drilling rig. Working condition information; the control module 50 is used to control the rock drilling rig, process data and realize human-computer interaction functions.
[0074] The positioning module 30 includes positioning equipment such as a range finder and a total station to realize the positioning of the rock drilling jumbo relative to the tunnel face, which is processed and stored in the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com