Device for vertical connection construction of upper-layer and lower-layer assembly type steel-concrete combined pipes
A technology of construction device and combined pipe, which is applied in the direction of construction, building structure, and building material processing, etc. It can solve the problems of affecting stability, occupying a large crane, affecting other operations on the construction site, etc., and achieve the effect of improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Embodiment one: if Figure 1-Figure 7 As shown, the vertical connection construction device for the upper and lower layers of the assembled steel-concrete composite pipe of the present invention includes a fixed lower-layer steel-concrete composite pipe 1 and an upper-layer steel-concrete composite pipe 2 to be fixed on the top of the lower-layer steel-concrete composite pipe 1 , between the lower steel-concrete composite pipe 1 and the lower steel-concrete composite pipe 1, there are several sets of temporary positioning devices, and each set of temporary positioning devices includes two sets of push-type locators, and the two sets of push-type locators are respectively located in the lower steel-concrete composite pipe. On the front side and rear side of the pipe 1 and the steel-concrete composite pipe 1 in the lower layer, two sets of push-type locators are symmetrically arranged front and back.
[0031] A set of push-type locators on the front side includes an upper...
Embodiment 2
[0046] Embodiment two: if Figure 8 As shown, the difference between this embodiment and Embodiment 1 is that the upper tie rod assembly 11 includes an upper hanging ring 21, a lower hanging ring 22 and a turnbuckle 23, and the upper end of the upper hanging ring 21 is hooked on the upper part of the upper support plate 7. In the positioning groove 9, the upper end of the turnbuckle 23 is connected with the bottom of the upper hanging ring 21, the lower end of the lower hanging ring 22 is pierced and connected in the front pull hole, and the lower end of the turnbuckle 23 is connected with the top of the lower hanging ring 22.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com