Flood disaster assessment method, device and apparatus and computer storage medium
A flood and to-be-assessed technology, which is applied in the field of devices, flood damage assessment methods, equipment and computer storage media, can solve the problem that flood damage assessment cannot have both analysis speed and accuracy at the same time, and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] like Figure 1~2 As shown, the flood disaster assessment method provided in this embodiment includes the following steps:
[0055] S101. Obtain oblique image data of the region to be evaluated, and use the oblique image data to establish a DSM image map of the region to be evaluated.
[0056] Step S101 is to obtain the DSM image map of the area to be evaluated, DSM (Digital Surface Model, digital surface model) image Figure 1 This kind of data map is generated by clipping the data map according to the range of the map after being corrected by the pixel-by-pixel projection difference, and then mosaiced according to the influence. It can display the ground height of buildings, bridges and trees on the ground.
[0057] In this embodiment, the oblique image data of the area to be evaluated is used as the data basis to obtain the DSM image map of the area to be evaluated. The specific establishment method will be described in detail below.
[0058] At the same time, in thi...
Embodiment 2
[0099] like figure 2 As shown, the present embodiment provides a specific implementation manner of specifically establishing a DSM image map, which specifically includes the following steps:
[0100] S101a. Perform aerial triangulation calculation on the oblique image data to obtain the control points of the area to be evaluated.
[0101] S101b. Perform dense image matching according to the control points to obtain point cloud data of the area to be evaluated.
[0102] S101c. Construct a TIN three-dimensional grid according to the point cloud data, and generate a three-dimensional model of the blank texture of the area to be evaluated.
[0103] S101d. Perform texture mapping on the three-dimensional model to obtain a three-dimensional scene of the region to be evaluated.
[0104] S101e. Generate a DSM image map of the region to be evaluated according to the three-dimensional scene.
[0105] In this embodiment, the oblique image data of the area to be evaluated is obtained ...
Embodiment 3
[0120] like image 3 As shown, this embodiment provides a device for implementing the method for assessing flood damage in Embodiment 1, including a DSM image generation module, a grid processing module, an interference elimination module, and a submerged water map calculation module.
[0121] The DSM image generation module is used to obtain oblique image data and generate a DSM image map of the area to be evaluated.
[0122] The grid processing module is communicatively connected to the DSM image generation module, and is used to obtain a grid map of the flooded area according to the DSM image map, and perform vector conversion on the grid map of the flooded area to obtain the flooded area Vector illustration.
[0123] The interference removal module is connected to the raster processing module by communication, and is used for removing interference on the vector map of the flooded area to obtain a real vector map of the flooded area.
[0124] The flooded water level map c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com